Part of the Refit - 2025/ 2026 series. Draft — Lee to review. As-built to the September 2026 break; the array was still being re-configured at that point (see Outcome).

The aft arch does a lot of jobs on this boat. It carries about 4 kW of solar, lifts the dinghy, mounts the RADAR, Starlink, a security camera, the stern nav light, the life-raft cradle, two scuba-tank holders, rod holders for trolling, and — eventually — two hanging chairs. It is also the single biggest visual change to the boat, and the thing that fought us the hardest.

Description

Before and after

Before After

The original stern arch

Panels on the new arch, 22 Jul 2026

As found — earlier photos (5)

The design

The structure is three arches and a set of legs, built by Atlantic Towers:

  • the main arch, which carries the aft half of the solar grid
  • a forward hinging arch that carries the front half of the grid and folds up so we can reach the panels
  • the dinghy-lift arch
  • support legs for the forward arch

The cockpit hardtop is a separate Atlantic Towers piece on its own legs, with a purpose-built ladder whose odd shape is deliberate structural triangulation. It carries a second, smaller bank of flexible panels.

Above the arch: RADAR, Starlink, camera, GPS/satellite compass (MSC 10), rig light, VHF antenna, and the nav-light mount. The boom was raised 3 feet to clear the arch. The split backstay passes through the plane of the array about 25 inches forward of the chainplate, which drove a lot of the geometry.

Deck layout and geometry: hatch spacing, seat/cabin dimensions, boom clearance, and where the split backstay crosses the array plane.

Build photos: see the AFT Arch gallery.

The solar array

Final build (confirmed by Lee, September 2026): three Victron SmartSolar MPPT controllers, not the four in the original design. A 150/85 runs six Bouge RV 300 W bifacial panels (3S2P) — the replacement panels from the burn-through saga below. A 150/65 runs four more of the same Bouge RV 300 W bifacials (2S2P). A 150/45 runs the six flexible CIGS panels on the hardtop (4×200 W + 2×100 W = 1,000 W, wired as 2 parallel strings). 4,000 W total. See Electrical for the charging side.

The original 4-string design (150/85, 150/60, 150/45, 100/30) — superseded by the 3-controller final build described above, after the panel failures and replacements.

Real-world: on a partly-cloudy New Orleans afternoon, about 3.4 kW off a 4 kW ceiling — 85 percent efficient — and better expected further south.

Access

The two centre panels of the ten are hinged so they lift for cleaning and maintenance from above. There is a telescoping aluminium plank and a telescoping ladder aboard for reaching the outboard parts of the structure, and a fold-down step or two on the mast for the same reason higher up.

Diagrams attached above (from solar design.pptx): deck/arch geometry with backstay clearance and panel layout · array electrical configuration (strings → MPPTs). These are the 4-string design (150/85, 150/60, 150/45, 100/30); the panel-count/rework since the burn-through replacements (see "What went wrong" below) isn't reflected in this design-stage diagram yet.

Plan

None written up yet. (Lee to add.)

Outcome

Status is current to the September 2026 break. The dated detail — what broke, what got rebuilt, what we tested — is in the build log below.

What went wrong

The full sequence — the frame sized for 8 panels instead of 10, the hardtop panels that lost their space, the forgotten solar cutoff fuse, the unseated connectors, and the burn-through/replacement-panel-mismatch saga — is told in Lee's own words in the build log below (see especially Dec 2025 and Jul–Aug 2026).

Still open (September 2026)

  • Final wiring and test of the re-configured array
  • Longer power cables for the two hinged panels
  • Blocking diodes on each paralleled string
  • Full bolt-down of the replacement panels
  • Bouge RV warranty claim on panel #3

Lessons learned

The one durable lesson: inline blocking diodes on every paralleled string should have been in the design from the start and weren't — that's now being retrofitted.

Build log — Lee's Facebook posts, verbatim

The paragraphs below are copied directly from Lee's own Facebook posts during the build (typos included) — not a paraphrase. Dates are the post date, not always the exact work date.

24 May 2025: No pictures today. The first batch of solar panels are at the Yard. Now all we need is the solar arch (which hasn't even started fabrication - but that's a different story).

27 May 2025: The solar panels for the back arch are at least stored now with boat.

3 Jun 2025: Finally, I helped the yard guy who is stripping the deck to unbolt the first side of the old solar arch. Hopefully tomorrow we will have it off the boat to make way for the new one.

9 Jun 2025: Big day today. Old solar arch is now on the ground and the Propane locker is no more with our lazzarette now being symetrical once again. The freeboard has also been sanded.

2 Jul 2025: We also spent more time consulting w Atlantic Towers on our Hardtop and Solar arch. Design is almost ready to go to production.

3 Sep 2025: The solar arch is fabricated and the cockpit enclosure started manufacture today.

18 Sep 2025: We also got word the custom fabrication is complete by Atlantic Towers and they are sorting out shipping. The boat's exterior is going to get a major make-over shortly.

23 Sep 2025: Every day more items show up for us to install. Today we signed the contract for a dedicated truck to bring the hard top and solar arch down from New Jersey. The hatches are winding their way through CPB at the Canadian border. So big changes are the the near future.

1 Oct 2025: We also finished routing the solar wiring and data cabling and the hot water heater wiring so those items can be connected once physically installed.

3 Oct 2025: Our delivery of the arch work is MIA and no contact. I am hoping he was late getting into town and just checked into a hotel and he will just show Up in the AM. First of all both the Solar arch and Cockpit hardtop were delivered (some assembly required). Also the rehabbed hatches were also delivered.

7 Oct 2025: We also took delivery of the flexible solar panels today for the hardtop as well as new light fixtures for the engine room and the heads and shower.

15 Oct 2025: We then decided to unwrap and start the tinker toy project. Our hope is to drop the engine in and the immediately install both the solar arch and the cockpit hard tip.

14 Dec 2025: And now for the bad news. We are starting to get serious about installing the Atlantic Towers Solar arch and cockpit hardtop. The hard top is going to be pretty straightforward and is planned for Wed this week. We then plan to do the solar arch in 2 sessions. The first on Fri installing the vertical supports and then over the weekend, We will build the solar array frame and then we will install it on the following Mon. Towards that end, we are putting some effort into verifying how this is all going to go together, double checking measurements and instructions and generally giving everything a good once over, before sitting down with the yard on Tues to develop the actual install plan. The first issue we discovered is that the array is sized for 8 panels (2x4) as opposed to 10 (2x5) as I asked for. WTFO. So we started looking at alternative plans and decided to check the actual solar panels to confirm measurements and verify the frame construction as we need to anchor the panels on when we are all done. This is where things really got interesting. The solar panel dimensions don't match the web site published dimensions by as much as 3". another WTFO. We are now deep into a replan to try to make this all work. There is a tentative plan, but there is still some engineering analysis that we will be doing tomorrow and Monday. The weather here is supposed to be frigid the next 48 hrs or so, so the yard decided to call their yard employees in to work today and they are not planning to work on Mon with 20 deg wind chills. In all likelihood, we will need 2 more pieces of AL bar to redesign the frame to make all of this work. We will share the before and after designs once we are satisfied. It's not the end of the world, but another $600+ that we weren't planning on spending.

17 Dec 2025: Today was crane day. The hardtop is now sitting on the boat. We built a wood frame to hold it and then strapped it down. We'll actually install it later. We then turned our attention to the primary support arch/frame for the solar array, dinghy lift etc. This is quite the science project as it is all angles. After 3 cuts and 5 lifts it is now cut to size and it is basically level side to side and level front to back. We ran out of work day to start anchoring it to the boat. That will take most of tomorrow morning.

19 Dec 2025: Crane day ... day 2. Today started off quite bumpy. The yard went through 4 pieces of lifting machinery before punting and respooling the crane. So it wasn't till well after lunch that the arch was hoisted. In the mean time we got the primary legs on the hardtop dry fitted. Once the arch was back in the air, they did get the boat side of the leg feet secured before they ran out of work day. ASSUMING nothing else breaks, the arch should be mounted tomorrow. I also got the front legs of the hardtop cut to length and "tape" fitted. We have a decent chance of having the hardtop mounted tomorrow. The yard worked for several hours this morning and the back part of the solar arch system is secured to the boat. The arch system is actually 3 separate arches and another set of legs. There is a arch that hinges forward and holds the forward part of the solar array grid. The 3rd arch is actually the dinghy lift. The legs help support the forward arch. The forward arch is on the boat but needs to be trimmed before being ready for final install. The dinghy lift arch is still sitting below the boat. Just ran out of time today. What messed today's plan was trying to install the boat side of the hardtop primary legs. We got the top leveled and centered. Position the legs only to discover the feet were directly above bulkheads. So what should have been simply drilling 8 holes and securing everything, turned into additional interior dissassembly, cutting the Bulkhead (non structural) and then finally installing the bolts. Dry fit only.

15 Jan 2026: Today we will likely go back to working on the Solar arch as my yard helper is on a road call. Took a break from plumbing and went back to the arch work. Made 2 mistakes, but neither is catastrophic. 1 is fairly easy to recover from but it's some rework, i was trying to avoid , and the second will impact the solar grid, but that is for another day. Tomorrow I am supposed to have 2 laborers helping so I hope to get further with plumbing - we received a few more pieces today. I also hope to have the archwork "finished" for now. It's nice to have goals. The one gotcha was when I cut the forward leaning arch (too short btw) I got into a reinforcing sleeve that then necessitated machining of the feet. Fortunately the guy helping me has a machine shop on site and was able to turn down the cup on both feet to fit inside.

17 Jan 2026: Worked this morning. Hardtop is now anchored to the boat and standing on its own.

21 Jan 2026: We also laid out the solar array frame (see pic). I think we need a bigger boat...

30 Jan 2026: I got the dinghy lift installed yesterday. I was waiting on yard help (a lift) and some 3-d printing. We'll the 3-d printing finished but no yard so I used some Yankee enginuity and successfully did it myself. See pic. I still need the lift to drill some holes, but that will likely happen when we mount the solar array. See pic I also drilled most of the holes to thrubolt the all archwork to their legs. I was waiting on 3-d printing pieces for that and they are now done. I managed to break a drill bit in the process. See pics. The 3-d pieces will replace AL pieces which are going back for a substantial refund. We also printed a bunch of GPS and other mounts to secure that stuff to the solar array. The boat should look very different in a week or so. The fasteners for the array should arrive today, so that assembly is imminent.

3 Feb 2026: Quick post. Bought a benchtop drill press yesterday. We have 400+ holes to drill to build out the solar array frame. Decided it was quicker and more accurate to go this way. Had to make some supports as the bars are 12' long. Did some test holes yesterday to verify everything and today we will spend drilling holes. After a long day of making AL shavings we got about 50% of the way there.

5 Feb 2026: Well I didn't get the help N I was looking for this morning and ended up taking it all apart and redoing with help this afternoon. Good chance we'll have the array on the g e boat before we quit tomorrow.

6 Feb 2026: So we made some progress today. It was cold out there today. We decided that we needed to mount all of the electronics and lights before lifting this into place as the stuff further Outboard will be very difficult to reach. This turned out to be a good idea as we had to rearrange the order so things will fit. We have a few more lights yet to go and the adapter for starlink which should all be 3-d printed by tomorrow as well as some wiring. We were going to mount the solar panels while at ground level, but that will interfere with the grid mounting bolts so we will be doing the panels from a manlift. The array is on the boat. We are fighting with mounting holes now. 4 bolts are set. We thought we had at least 4 more ready to go, but apparently we didn't do a great job holding thing in place so those holes are not lined up. We will start solar panel install once this is properly anchored in place.

7 Feb 2026: 6 of the 8 planned solar panels are partially mounted. At least 2 tight bolts and some zip ties for overnight. Left the other 2 off for now to make it easier to access everything still needing wiring. There are 2 additional panels planned but will likely wait til the standing rigging is set before they get added. It certainly changes the character of the boat. Granted the wood work platform will obviously go away. I actually ordered a telescoping AL plank to have on board as well as a telescoping ladder because reaching elements on this contraption for maintenence will be difficult without them.

22 Feb 2026: So weekend update. With the Lazarette now painted, we continued pulling wire in preparation for hooking everything in the back of the boat up. We discovered we were missing one type of wire we planned to use to bring solar power inside the boat, so we didn't drill any holes in the deck yet. I had bought wire (large gage) when we got the panels, but after some math and looking at how many wires need to go through the deck we opted for a different approach.

26 Feb 2026: Well yard help was a no show yesterday. We got a bunch of small projects done. Some lights, cleaning (trying to find parts we bought...), and the big task was getting the hinges installed on the 2 fwd center panels to allow us to open/ hoses them to allow us access to the top of the array for maintenance and cleaning.

27 Feb 2026: Got some more stuff done today. We shifted gears on the pvc conduit we are using to route the wires from the deck to the top of the solar arch. We had tried bending light weight pvc with a heat blanket, but didn't like the results. The Grey electrical pvc fittings include large sweeping 90 degree pieces and that was what I was looking for. The Grey pvc blended into the arch frame nicely. So we have that "installed" and some of the wire pulled.

2 Mar 2026: About half of the remaining solar panel bokts are installed.

3 Mar 2026: Good day today. Lifelines are done as far as we can go for now (we are talking about how to properly support the last 2 solar panels in back and that will likely involve some more AL work which will end up as the lifelines anchor points for the back. I also got the deck penetrations done for the wiring for everything on the back arch. Lots of terminations in our future to hook it all up, but the job took most of the day including routing some more wire. The back structure provides mounting for ALOT of stuff (electrical, electronics. Safety gear (including the life raft) and of course fishing gear holders for trolling. We also got 2 scuba tank holders. We may do 2 or 4 more depending on how things fit together. We will likely also mount a rod to hang scuba gear back there somewhere.)

6 Mar 2026: We continued to get wires terminated today resulting in a "smoke test" (smoke stayed inside) of the first of 3 solar controllers. Unfortunately by the time we flipped the isolation breakers it was raining so we will wait til tomorrow to see a more realistic power output. Everything is installed but we have some cable dressing in our near future as well as securing the piece of plywood they are attached to. Controller 2 has 2 of the 4 solar panels that could be hooked up and controller 3 is awaiting the cockpit solar panrl installation. All 3 solar controllers woke up and have gotten their firmware updates.

7 Mar 2026: We also went back and finished configuring the solar controllers. We got them powered up but didn't configure them yesterday. They are now ready to contribute as we get more stuff hooked up.

10 Mar 2026: Well I didn't post yesterday as I was frustrated with my solar installation. I had more trouble shooting to do and there wasn't much to say that was meaningful. After most of today updating firmware (the battery firmware which had been hanging out there), and replacing batteries in my temp sensors- 1 of them was bad - water damage) and spending more time reading manuals and talking with the engineers who make the batteries we still were struggling as to why the panels weren't producing power as expected. I even cleaned the panels. They were producing the right voltage, but almost no amps. It was really weird. We went through lots of settings in places mortal people shouldn't be and tweaked here and there, but no change. Well at some point you need to dissassemble to test more explicitly. What was the most weird parameter was that the battery voltage at the controller was reporting 2 V higher than the batteries. How could that be the case? We decided to disconnect things and measure individually vs as a big group and that's when we saw that the battery bus now read zero v. Huh? Oh wait, when we flipped the solar cut off switch to on, we never installed the fuse behind it. We intentionally left these fuses out until we were ready with those devices as a safety measure. Fuse in, controller now producing power. No one questioned if the batteries were actually connected as we all assumed they were. For mid afternoon in New Orleans on a partly cloudy day 1800w of panels was producing up to 1200w. Not bad. We added another 600w - half of the panels planned on the 2nd controller. The remaining 2 are pending some more framing support and standing rigging. Tomorrow we might start to hardtop panel install. System integration can be challenging. Attention to detail is a must.

20 Mar 2026: Also spent some time with the battery manufacturer on the phone and online. We've been chasing a programming/ configuration issue within the electrical system that was resulting in a high voltage alarm. We think we have the right settings now as the solar controllers are backing off as they should be.

30 Mar 2026: We also needed adapters to attach fixtures to our new AL structure. Most of the standard stuff comes with 1" mounting brackets. The AL pipe is 2"+.

14 Apr 2026: We also started working on the solar panels on the hardtop. We have a plan, but the tape is thought was on the boat for that purpose is one grade lower than I want to use and the "gift" they sent with the panels turned out to be velcro instead of tape...

17 Apr 2026: Christmas in Apr. Received 2 shipments in the last 2 days - the last piece from Atlantic Towers for the back solar arch and then today our most important delivery was our new $25k collapsible cooler that came with the free standing rigging and new roller furlers.

23 Apr 2026: And the solar panels are adhered to the hard top. Still working on getting them wired in. The hard top's dimensions didn't quite meet my needs as the designer didn't think through the problem completely and as a result I lost 2x 100w panels for lack of space. I told him the overall dimensions I needed and then he significantly rounded the corners so the last 2 panels would have overhung ridiculously. The original plan called for the 4x100 panels on 1 controller and 4x200 on a second controller. Now we have 2x100 and 4x200. We are working through the math/ electrical theory to get all 6 onto the same controller without loosing production power. The picture below shows the open space ahead and behind the outer panels due to not having room for the last 2 100w panels.

25 Apr 2026: The life raft cradle is also mounted. In the picture below it is mounted on the outside of the solar arch. I wanted an out of the way location that had unobstructed "view" of the sky so if it had to deploy it wouldn't get hung up on stuff overhead. Also didn't want it on the foredeck as it would be in the way and have all sorts of rigging above it. I selected the arch location as the best option I had available.

2 May 2026: Looks like there was a solar panel wire hanging down in the picture - yes I still need to anchor all of the solar wiring on the hardtop.

5 May 2026: We also attempted to fit the final arch piece only to discover once we trimmed it, we encountered the inner stiffener pipe. We need to do some custom fabrication to install the arch as a result. Our machinest is on vacation this week, so that will wait til next week. He has a bunch of stuff to do to get us in the water once he gets back.

8 May 2026: Got the pieces back from the local welder/ Machinist. So the last pieces of the solar arch are test fitted awaiting standing rigging for final assembly.

22 Jul 2026: We spent storm prep day taking a major step towards finishing up our solar arch. Another brutal day sun/temp wise but no rain. We got the last (forward most arch) bolted in place and then attached the final 2 hard panels. All day to drill and install 20 bolts (all drilling overhead). There are 4 more bolts to wrap up the original panel install and then the horizontal bars the scuba tanks were going to be atrached to are getting replaced with longer bars so they can be moved lower to properly secure the tanks. We have to do some work to integrat the 2 new panels electrically and then wrap up 3 more connections on the back (stern Nav light, Radar power and our dinghy alarm loop). Another major step closer. This one was being blocked by the standing rigging install for months. The panels had a Jun 2025 shipping date.... We'll see what we get for weather tomorrow and pick tomorrow's project accordingly.

23 Jul 2026: Well after a day plus of troubleshooting to include a Fubar Solar panel tester, we have finally achieved full power. The issue i ran into was 2 connectors that where made months ago never got properly seated internally. Once I started with a good solar tester, I was able to verify all of my wiring and even after swapping out mppt charges, I finally started looking at connectors and these 2 which worked until I pulled them apart to integrate the new panels in place must have come loose internally. When I separated their housings, the internal pins came right out. I properly seated them and low and behold power was flowing. Pic below is our energy monitoring screen. Of a theoretical limit of 4kw, we are showing 3.4kw. 85% efficient in New Orleans. Should be even better once we get further south.

25 Jul 2026: We discovered that 2 of our solar panels are damaged - burnthru. Not sure the reason. We contacted BougeRV and they are working on the Warrenty claim.

2 Aug 2026: We also are having a discussion with Bouge RV (our solar panel maker) over an issue with 2 of our panels. Apparently daily shade from the RADAR dome is causing hot spots that is leading to burn thru. I am having trouble swallowing that explanation, but they are sending me 2 new panels (different model, but supposed to be the same electrically and the same size). We'll see.

18 Aug 2026: We received the 2 replacement solar panels yesterday along with some replacement relays. Lots of work can be done inside.

22 Aug 2026: Today was solar panel day. I was assured they were the same electrically (they are not) and you guessed it they are physically different. Wider and shorter. They simply don't fit where they need to go. I have started the claim on panel #3 and in order to reengineer to accomidate the new panel dimensions, I will order a 4th panel so I have a clean row of 4 of the new size. They will then be wired together so they match electrically and then I need to rearrange the remaing panels physically and electrically to include added a key component that prevents the burn thru issue to begin with on each string. I then need to get yet MORE aluminum bar stock to extend rails and install new rails to carry the 4 new panels. What a PITA because no one recognized the issue up front and said, hey why don't you add these things (inline diodes to prevent reverse current flow) months ago when I tried to get BougeRV to help with the design. These things ($9 each) should go on every string that is paralleled to prevent this from ever being an issue. $40 will cost me almost $1k to re-engineer. Then we had a SEVERE t-storm roll through about dinner time. 70+ knot gusts. Was exciting. I am glad we tied the new panels down. As they didn't fit they were sitting on top "in place". They would have blown off. As it is, 1 slid well out of place.

31 Aug 2026: Long weekend, but the solar array is reassembled / reconfigured with the new panels. We need to test and confirm tomorrow before we go live. See need to acquire or make 2 extension cables to make it work the way I want - the middle 2 panels of the 10 are hinged so I can get up above and clean and do maintenance. Their power cables need to be long enough for that to work. They are not as re configured.

6 Sep 2026: It's been a slow week. We are blocked awaiting parts and contractor action. We did recover the solar system and got everything remounted and back to generating power.