Jump to content

Electrical: Difference between revisions

From Media for Unladen Swallow
Embed the remaining uploaded Facebook photos at their dated log entries
Add the remaining Facebook build-log photos Lee approved (review sheet)
 
Line 278: Line 278:
File:Electrical_2025-05-08_132593.jpg|The electrical panel ready to scavenge parts (meters are already out)
File:Electrical_2025-05-08_132593.jpg|The electrical panel ready to scavenge parts (meters are already out)
File:Electrical_2025-05-08_277593.jpg|3 hours later it's all apart. The 2 switches are where shore power come to.  They will go also, but not quite...
File:Electrical_2025-05-08_277593.jpg|3 hours later it's all apart. The 2 switches are where shore power come to.  They will go also, but not quite...
File:Electrical_2025-05-09_672593.jpg|The 2 yellow Breakers have stripped bolts.. too bad they were still servicable.
File:Electrical_2025-05-11_147593.jpg|The old engine panel. Components are still usable.
</gallery>
</gallery>


Line 299: Line 301:


'''20 May 2025:''' As promised visible change has slowed as I transition to the electronics side of things.  There is still plenty left to do electrically, but the electronics side has more payoff with each connection.  It's a bit of a mess towards the bottom as I need to carral the data cables there that I don't plan to cut to exact lengths for now. I started assessing our cable needs to tie the DC bus together and othere than the biggest cables we have most of what we need.  We need a pile of connectors but they are easy enough to come by.
'''20 May 2025:''' As promised visible change has slowed as I transition to the electronics side of things.  There is still plenty left to do electrically, but the electronics side has more payoff with each connection.  It's a bit of a mess towards the bottom as I need to carral the data cables there that I don't plan to cut to exact lengths for now. I started assessing our cable needs to tie the DC bus together and othere than the biggest cables we have most of what we need.  We need a pile of connectors but they are easy enough to come by.
<gallery widths="220" heights="165">
File:Electrical_2025-05-22_277593.jpg|Some 110VAC Shop lights will make the next phase much easier inside the boat
</gallery>


'''24 May 2025:''' Tomorrow we will turn our attention to the hot water heater and the fresh water pump circuits and maybe start tying the blue boxes together with heavy (2/0 and 2 AWG wire).  We have 4/0 on order for the batteries and the inverter/charger circuits.
'''24 May 2025:''' Tomorrow we will turn our attention to the hot water heater and the fresh water pump circuits and maybe start tying the blue boxes together with heavy (2/0 and 2 AWG wire).  We have 4/0 on order for the batteries and the inverter/charger circuits.
Line 321: Line 327:


'''2 Jul 2025:''' We also spent more time consulting w Atlantic Towers on our Hardtop and Solar arch.  Design is almost ready to go to production.
'''2 Jul 2025:''' We also spent more time consulting w Atlantic Towers on our Hardtop and Solar arch.  Design is almost ready to go to production.
<gallery widths="220" heights="165">
File:Electrical_2025-07-02_702593.jpg|2 Jul 2025
</gallery>


'''14 Aug 2025:''' DC panel. Started with a blank panel 3 hours ago..  The original paint was bubbling w corrosion so it got powder coated before we left NOLA.  But in order to do that I had to completely dissassemble this beast. Took about 3 hours to reassemble.  Apparently, I didn't bring quite everything I needed so other than some connectors I ran out of, the final parts will have to wait til we are back in NOLA.  And no, I didn't take any original pictures.  This was assembled based on looking at each piece understanding its function and then assembling it based on that.  As some of the Breakers where involved in the Salsa induced shortout a year ago, we might have to replace them once I can start testing.  I have most of the new labels, but we will wait til it's mounted and confirm which circuits go to which functions.
'''14 Aug 2025:''' DC panel. Started with a blank panel 3 hours ago..  The original paint was bubbling w corrosion so it got powder coated before we left NOLA.  But in order to do that I had to completely dissassemble this beast. Took about 3 hours to reassemble.  Apparently, I didn't bring quite everything I needed so other than some connectors I ran out of, the final parts will have to wait til we are back in NOLA.  And no, I didn't take any original pictures.  This was assembled based on looking at each piece understanding its function and then assembling it based on that.  As some of the Breakers where involved in the Salsa induced shortout a year ago, we might have to replace them once I can start testing.  I have most of the new labels, but we will wait til it's mounted and confirm which circuits go to which functions.
Line 364: Line 374:
File:Electrical_2025-09-26_822593.jpg|This is how we distribute the common power to all 4 pumps and the colorful electronics piece allows us to...
File:Electrical_2025-09-26_822593.jpg|This is how we distribute the common power to all 4 pumps and the colorful electronics piece allows us to...
File:Electrical_2025-09-26_967593.jpg|The back of the pump control panel
File:Electrical_2025-09-26_967593.jpg|The back of the pump control panel
File:Electrical_2025-09-26_127593.jpg|Hum thought it was in better focus - this is the switch panel installed. It went in place of a piece of obsolete gear but the sizes weren't right so we will need some trim...
</gallery>
</gallery>


Line 400: Line 411:


'''25 Oct 2025:''' Along the way we threw away 6 old light fixtures whose guts were broken in some way.  The process of discovering those while trying to bring lights back online didn't help us along.  On top of that we discovered a wire embedded in the wall between a switch and the light had a screw embedded in it and was severed.  That discovery took a couple of hours.... There are still some lights not working that should be - we should be able to solve that tomorrow.  The leaking hatches are a different matter. We have also decided to swap several fixtures for new brighter ones.  Finally, there are several lights we thought were on switches that are not.  So we need to sort out which ones need switches on the light fixtures and maybe swap some others around as a result.
'''25 Oct 2025:''' Along the way we threw away 6 old light fixtures whose guts were broken in some way.  The process of discovering those while trying to bring lights back online didn't help us along.  On top of that we discovered a wire embedded in the wall between a switch and the light had a screw embedded in it and was severed.  That discovery took a couple of hours.... There are still some lights not working that should be - we should be able to solve that tomorrow.  The leaking hatches are a different matter. We have also decided to swap several fixtures for new brighter ones.  Finally, there are several lights we thought were on switches that are not.  So we need to sort out which ones need switches on the light fixtures and maybe swap some others around as a result.
<gallery widths="220" heights="165">
File:Electrical_2025-10-25_202593.jpg|25 Oct 2025
</gallery>


'''26 Oct 2025:''' Shortish day today.  Bunch of little projects to deal with unfinished work from this week.  Other than the Bilge panel, which appears to have issues, we were able to get a light switch installed, shift to a surface mount cable for another light switch, add a light in the patch panel area and put a small resettable fuse inline with the part of the boat's electrical system which is always powered. We got replacement LED bulbs - we thought we ordered 24V bulbs but 12V bulbs showed up for our floor lights and even though they are LEDs, they didn't do well with 24V's and were the source of some of the odors we ran into when we first powered up.  Unfortunately you can't put the grey smoke back in the electronics once it escapes. Tomorrow, the plan is to wrap up the lighting on the starboard side of the boat to include re-assembling the cabinetry that we pulled apart to access the wire trays.  It will take most of the day clean that mess up.  We have one more set of door activated switches that are not working and I am almost positive it's related to the ground issue from earlier.  These switches are not part of the boat's original  wiring, so when I took care of the rest of the ground issue, these were probably missed because they are located elsewhere.
'''26 Oct 2025:''' Shortish day today.  Bunch of little projects to deal with unfinished work from this week.  Other than the Bilge panel, which appears to have issues, we were able to get a light switch installed, shift to a surface mount cable for another light switch, add a light in the patch panel area and put a small resettable fuse inline with the part of the boat's electrical system which is always powered. We got replacement LED bulbs - we thought we ordered 24V bulbs but 12V bulbs showed up for our floor lights and even though they are LEDs, they didn't do well with 24V's and were the source of some of the odors we ran into when we first powered up.  Unfortunately you can't put the grey smoke back in the electronics once it escapes. Tomorrow, the plan is to wrap up the lighting on the starboard side of the boat to include re-assembling the cabinetry that we pulled apart to access the wire trays.  It will take most of the day clean that mess up.  We have one more set of door activated switches that are not working and I am almost positive it's related to the ground issue from earlier.  These switches are not part of the boat's original  wiring, so when I took care of the rest of the ground issue, these were probably missed because they are located elsewhere.
Line 408: Line 423:


'''31 Oct 2025:''' The 2nd is the smoking (literally) gun pointing to cheap Chinese parts from Amazon.  The 3 pieces with the burn labels are 24V to 12V voltage converters.  They didn't survive power on.  These are important as there are several pieces of electronics that are not available in 24V.  We are re-architecting this part of the electrical system to come up with a more robust solution.  We have the beginnings of a solution, we are just doing some more analysis before we spend some more money.
'''31 Oct 2025:''' The 2nd is the smoking (literally) gun pointing to cheap Chinese parts from Amazon.  The 3 pieces with the burn labels are 24V to 12V voltage converters.  They didn't survive power on.  These are important as there are several pieces of electronics that are not available in 24V.  We are re-architecting this part of the electrical system to come up with a more robust solution.  We have the beginnings of a solution, we are just doing some more analysis before we spend some more money.
<gallery widths="220" heights="165">
File:Electrical_2025-10-31_497593.jpg|31 Oct 2025
File:Electrical_2025-10-31_517593.jpg|31 Oct 2025
</gallery>


'''3 Nov 2025:''' We then moved onto pulling the wire for the forward Hull Shield controller and then mounted it and several other things in the space under the salon couch.  This is the 3rd space and the one that is going to be usable as additional storage.  This space is also where the mast connections are made so we will be back in here in the future. In the next space over, we installed the 110VAC outlet we will use to power our portable Refrigerator/ Freezer.  We now have 3 more AC outlets still to go - the one in the galley, the scuba compressor and finally the cockpit outlet.  I have been putting off the gally outlet as it is going to be quite difficult to reach.  The other 2 areas are not ready for the install.
'''3 Nov 2025:''' We then moved onto pulling the wire for the forward Hull Shield controller and then mounted it and several other things in the space under the salon couch.  This is the 3rd space and the one that is going to be usable as additional storage.  This space is also where the mast connections are made so we will be back in here in the future. In the next space over, we installed the 110VAC outlet we will use to power our portable Refrigerator/ Freezer.  We now have 3 more AC outlets still to go - the one in the galley, the scuba compressor and finally the cockpit outlet.  I have been putting off the gally outlet as it is going to be quite difficult to reach.  The other 2 areas are not ready for the install.
Line 435: Line 455:


'''5 Dec 2025:''' We made more progress in the electrical front with the alarm panel harness now being complete. And that then led to reordering the boat side of the alarm patch terminals, which led to the realization that we have a bit more work to do on that front before we can call that one wired up. We did some more work to bring what we are affectionately calling our "Always On" bus online.  We have all but 2 devices online and working.  This bus powers the monitoring systems (alarm panel, electrical monitoring, fire,  smoke) and the panel lights for the electrical panels.  We have one more section to setup, but the pic below shows the panels in a more functional state.  Our next big task is to create all of the custom labels.  The company that manufactures the panels offers the service, but their distributors won't take orders because it's too much work.  We are looking at alternatives (of course these are non-standard sizes)
'''5 Dec 2025:''' We made more progress in the electrical front with the alarm panel harness now being complete. And that then led to reordering the boat side of the alarm patch terminals, which led to the realization that we have a bit more work to do on that front before we can call that one wired up. We did some more work to bring what we are affectionately calling our "Always On" bus online.  We have all but 2 devices online and working.  This bus powers the monitoring systems (alarm panel, electrical monitoring, fire,  smoke) and the panel lights for the electrical panels.  We have one more section to setup, but the pic below shows the panels in a more functional state.  Our next big task is to create all of the custom labels.  The company that manufactures the panels offers the service, but their distributors won't take orders because it's too much work.  We are looking at alternatives (of course these are non-standard sizes)
<gallery widths="220" heights="165">
File:Electrical_2025-12-05_482593.jpg|5 Dec 2025
</gallery>


'''6 Dec 2025:''' I did some panel work to prepare for mounting the ship's IT infrastructure as well as the electronics in the Nav station.  The electronics panel also got trimmed to better accomidate being mounted in a door frame which I will make while we are in FL fir Christmas. OK promised pictures of engine mounts and the first of the ship's IT Stuff is installed
'''6 Dec 2025:''' I did some panel work to prepare for mounting the ship's IT infrastructure as well as the electronics in the Nav station.  The electronics panel also got trimmed to better accomidate being mounted in a door frame which I will make while we are in FL fir Christmas. OK promised pictures of engine mounts and the first of the ship's IT Stuff is installed
Line 452: Line 476:


'''28 Feb 2026:''' Electronics panel.  Everything is mounted accdpt a MIA A-C outlet (single plug) and the mic mount.
'''28 Feb 2026:''' Electronics panel.  Everything is mounted accdpt a MIA A-C outlet (single plug) and the mic mount.
<gallery widths="220" heights="165">
File:Electrical_2026-02-28_617593.jpg|28 Feb 2026
</gallery>


'''11 Mar 2026:''' We made some more progress outside terminating wires and mocking up the new helm station.  Also installed the pad eyes that the anchor road will be fastened to.  My anchor road will be attached to my boat.... The pic is the mock up of the helm station panel.  Large hole upper left corner will be 2 rows of rocker switches and push to reset breakers.  Since our chart plotters go on swivel mounts, we decided to use the extra space for a deep storage cubby. The circles represent usb, 12v, volt meter, and a reset able buzzer tied to the alarm panel.  The engine on/start/stop controls are in the upper right corner.
'''11 Mar 2026:''' We made some more progress outside terminating wires and mocking up the new helm station.  Also installed the pad eyes that the anchor road will be fastened to.  My anchor road will be attached to my boat.... The pic is the mock up of the helm station panel.  Large hole upper left corner will be 2 rows of rocker switches and push to reset breakers.  Since our chart plotters go on swivel mounts, we decided to use the extra space for a deep storage cubby. The circles represent usb, 12v, volt meter, and a reset able buzzer tied to the alarm panel.  The engine on/start/stop controls are in the upper right corner.
<gallery widths="220" heights="165">
File:Electrical_2026-03-11_252593.jpg|11 Mar 2026
</gallery>


'''12 Mar 2026:''' What statted out with gale firce winds became a nice day.
'''12 Mar 2026:''' What statted out with gale firce winds became a nice day.
Line 467: Line 499:
<gallery widths="220" heights="165">
<gallery widths="220" heights="165">
File:Electrical_2026-03-25_832593.jpg|After a full afternoon running the ac we used 4% of our batteries with solar almost keeping up.  This is not...
File:Electrical_2026-03-25_832593.jpg|After a full afternoon running the ac we used 4% of our batteries with solar almost keeping up.  This is not...
File:Electrical_2026-03-26_022593.jpg|Back of the electronics panel. Almost everything is connected, we still have more neatening up to do and function verification.
</gallery>
</gallery>


Line 480: Line 513:


'''22 Apr 2026:''' We started assembling the 12 VDC starter system yesterday. Pretty happy with the progress although the Orion DC-DC charger isn't behaving.  Unfortunately we have to take everything apart to get to it...the good news is everything is terminated and labeled now, so it's not the end of the world.
'''22 Apr 2026:''' We started assembling the 12 VDC starter system yesterday. Pretty happy with the progress although the Orion DC-DC charger isn't behaving.  Unfortunately we have to take everything apart to get to it...the good news is everything is terminated and labeled now, so it's not the end of the world.
<gallery widths="220" heights="165">
File:Electrical_2026-04-22_512593.jpg|22 Apr 2026
</gallery>


'''24 Apr 2026:''' After switching out a defective charger and adding another shunt for better monitoring our starter battery bank is fully online.  There is a final data cable needed that I hope to install tomorrow.
'''24 Apr 2026:''' After switching out a defective charger and adding another shunt for better monitoring our starter battery bank is fully online.  There is a final data cable needed that I hope to install tomorrow.
Line 488: Line 525:


'''6 May 2026:''' The batteries are now reporting on the 2nd data bus.  Hopefully, this will allow us to track down some of the odd readings.  We did find the root cause of our hot cable.  That is now corrected and we should be fine going forward.
'''6 May 2026:''' The batteries are now reporting on the 2nd data bus.  Hopefully, this will allow us to track down some of the odd readings.  We did find the root cause of our hot cable.  That is now corrected and we should be fine going forward.
<gallery widths="220" heights="165">
File:Electrical_2026-05-06_557593.jpg|6 May 2026
</gallery>


'''31 May 2026:''' More wrap up tasks today.  The engine room wiring is almost complete.  Brownie Hutchins got to learn how to do some waterproof electrical connectors and made a bunch of connections while I was troubleshooting other things. I also got the electronics panel almost wrapped up in the back.  Have 2 more wires to confirm and it will be done.
'''31 May 2026:''' More wrap up tasks today.  The engine room wiring is almost complete.  Brownie Hutchins got to learn how to do some waterproof electrical connectors and made a bunch of connections while I was troubleshooting other things. I also got the electronics panel almost wrapped up in the back.  Have 2 more wires to confirm and it will be done.
<gallery widths="220" heights="165">
<gallery widths="220" heights="165">
File:Electrical_2026-05-31_887593.jpg|Neatening up the Navstation some more with an integrated connector panel.  We really wanted access to the...
File:Electrical_2026-05-31_887593.jpg|Neatening up the Navstation some more with an integrated connector panel.  We really wanted access to the...
File:Electrical_2026-05-31_617593.jpg|The back of the electronics door. Everything is basically tied down - just a couple more stragglers. Way too many connections to deal with.
</gallery>
</gallery>



Latest revision as of 18:43, 28 September 2026

Part of the Refit - 2025/ 2026 series. Draft — Lee to review. As-built status is current to the September 2026 break; a few items are still open (see Outcome).

The Hylas came to us as a 12 VDC boat with four Group 8D flooded lead-acid batteries — one of which the termites had made a nest in — and 35 years of "it will work" wiring layered on top of the factory harness. What she has now is a 24 VDC house system built around a Victron ecosystem, roughly 4 kW of solar, a 900 Ah solid-state lithium bank, and enough monitoring and automation that the boat can mostly look after herself. Getting from one to the other took the better part of a year and a lot of grey smoke.

Important Disclaimer - I am not a certified marine electrician. The below was developed with the paid help of several folks who do this for a living. Unless you are actually trained to do this type of design, attempting on your own could result in serious injury or death. The voltages coming through the Solar Controllers will kill you. The amount of power stored in the batteries will easily weld steel if short circuited. Please seek qualified help before designing something like this and if you are unsure of how to install, the university of you tube is full of advice that can kill you or leave you with an unsafe system.

Description

Before and after

Before After

Nav-station wiring bay, 8 May 2025

The same bay after the rebuild, 27 Sep 2025

The four original lead-acid batteries, ready for recycling

The new lithium bank, anchored and ready for use, 21 Oct 2025

As found — earlier photos (43)

DC power overview

The DC Power system is the heart of the boat.

We store power using Solid State Lithium batteries setup in a 24VDC configuration. We want to have sufficient storage to operate everything for 5 days without significant solar input and without resorting to using the GenSet.

We can generate DC Power via Solar Panels (Direct DC) and via converted AC power through a Inverter/Charger and finally from the Balmar Alternator on the Main engine.

DC power consumers on the boat:

  • Starter Batteries for the Main Engine and GenSet
  • The Windlass
  • Sailing and Navigation Electronics
  • IT Infrastructure (DC to DC step down transformers) to include USB chargers
  • Lighting (interior, exterior, navigation)
  • Galley Refrigeration
  • Fresh and Saltwater Pumps
  • Electric Winches (via a 48VDC converter)

The house bank

Six Solid State Marine 24 V / 150 Ah packs in parallel — 900 Ah at 24 V, about 21.6 kWh — in a dry locker under the salon settee. The cells are a semi-solid-state NMC chemistry, seven in series per pack, which means the bank behaves more like a lead-acid or AGM than a flat-voltage LiFePO4 bank: the voltage slopes down predictably as the state of charge drops. Full, the bank sits near 29 V; empty, closer to 26.

Each pack has its own BMS. The primary BMS data bus runs to the Victron Cerbo GX, which gives us bank-level voltage, current, state of charge and health plus high/low alarms. That wasn't enough for us, so we also tapped the packs' second data bus (RS485) for a per-cell view of all 42 cells — see the 27 Apr 2026 build-log entry below for how.

Each pack is fused at the terminal with a 200 A MRBF. The main house fuse is a 400 A Class T. The positive and negative mains land at opposite ends of the bank so current shares evenly across the copper busbars (the 21 Oct 2025 busbar rework below is why that matters).

Charging

Solar — about 4 kW on the aft arch and the cockpit hardtop, feeding three Victron SmartSolar MPPT controllers: a 150/85 on six Bouge RV 300 W bifacial panels (3S2P), a 150/65 on four more of the same (2S2P) — both replacement strings from the burn-through saga on Solar — and a 150/45 on the six flexible CIGS panels on the hardtop (4×200 W + 2×100 W, 2 parallel strings). Wired as separate strings so each controller runs in its happy range. On a partly-cloudy New Orleans afternoon we see about 3.4 kW off a 4 kW theoretical limit — 85 percent — and it should be better once we get further south.

The original 4-string design — superseded by the 3-controller final build described above; see Solar for the full story.

Alternator — the new Yanmar 4JH80 carries a large-case Balmar alternator regulated by a Wakespeed WS500, talking to the Cerbo over VE.Can so the battery limits and the alternator work as one system.

Shore / generator — a 50 A shore inlet and the Westerbeke feed a Victron MultiPlus-II 120 V / 24 V, 5 kVA inverter/charger. 5 kW is probably overkill, but with the water heater and the electric galley we did not want the inverter to be the thing that couldn't keep up.

DC-DC — Victron Orion chargers keep the two 12 V starter batteries (main engine and generator) topped up from the house bank, and a third Orion sits inline as a voltage regulator ahead of the berth A/C blower, whose motor has a hard 28 V cutoff that a fully-charged bank exceeds (see 11 Jul 2026 below).

Distribution

Lynx 24 VDC distribution detail: house bank in, fused feeds out to house loads, inverter/charger, solar, windlass, the Always-On bus, and the 24→12 V starter charger.

The old factory patch panel came out and a new one went in that had to carry roughly four times as many circuits — AC, DC, the NMEA 2000 backbone, the boat's IP networks, and all of the Victron interconnects. From there:

  • 24 VDC panel with a daughter fuse block and daughter switch panels for the loads that wouldn't fit on the main panel
  • AC panel split into non-inverter circuits (battery charger, scuba compressor, salon A/C, galley outlets, cooktop, microwave) and inverter circuits (water heater, watermaker, cabin outlets, dinghy charger)
  • Nav-station switch panel (8 switches), cockpit switch panel, and a new helm switch panel — engine and generator start/stop, battery gauges, USB and 12 V outlets, all under a custom 3D-printed and laser-engraved fascia:
Panel Positions
Nav Station Chart plotters · RADAR · engine-room blowers · anchor wash · stereo · mast head lights (nav/anchor) · steaming/running lights · deck lights
Helm Horn · deck lights · transom light · loading light · rig light · courtesy light · (1 spare) · alarm arm · cockpit lights · aft wash · aft deck · compass light · windlass up/down · battery boost — 13 live positions, 1 spare
Nav pumps Aft black water · nav light · forward black water · (1 spare)
12 V sub-panel Oil · (1 spare) · fuel
  • 48 VDC for the two Selden electric primary winches, from its own converter
  • An "Always On" bus that powers the monitoring: the master alarm panel, the electrical and bilge monitoring, the fire and smoke detection, and the panel backlighting
The Always-On bus: Cerbo GX, fire/smoke sensors, the master alarm panel, and the RS485/Modbus chain that feeds the automation Pi.

Lights alone were a project — the corroded 1990 switches, a floating-ground hunt, and a bad batch of 12 V LED bulbs are all in the Oct 2025 build-log entries below.

Monitoring and automation

Two computers ride the boat: a Windows ship's PC and a Raspberry Pi 5, both fed by the NMEA 2000 bus through a software gateway that also bridges the older 0183 network the AIS lives on. Where the previous boat used two hardware boxes to do that translation, this one does it in software, and the result is a considerably more capable electronics environment than most sailboats carry.

The master alarm panel has 21 positions and is fed three ways — directly from float switches and sensors, from the NMEA 2000 network via the Cerbo and the Yacht Devices peripherals, and from a bank of more than twenty discrete relays and a Waveshare 8-channel Modbus relay module. The relays do more than switch things on and off: one closes a ground when it sees a positive, another turns the 110 VAC water heater on from a 24 VDC signal. Several are driven by automation — the water heater, a heavy load, only comes on once the batteries are full and there is still solar to spare, with a manual override for when a motor is running anyway.

That is where the system is today. Where it is going is a larger automation build we call CAMS v2.0 — see Boat Automation and Monitoring.

The IT fit

Behind the nav station, in about the footprint of a shoebox: the ship's PC, three external drives holding the media library, a network switch, a Starlink router, a cellular modem, and the converters that produce the 19 V, 12 V and 5 V the whole lot needs. Starlink and a parallel cellular setup handle connectivity; the media library (4,000-plus songs, all local) handles the part of passage-making where you don't want to be paying Starlink by the gigabyte for music.

Bonding

Every metal fitting below and near the waterline is tied together and run to a sacrificial zinc plate bolted through the hull. Over 35 years several of those bonding wires had broken or corroded — see the 21 Aug 2026 build-log entry below for the repair.

The bonding circuit: deck hardware, keel coolers, the main engine (shaft, strut and prop zinc), the A/Cs and the MultiPlus, all daisy-chained to the hull zinc under the aft berth.

Vendors

Role Vendor
System design Cay Electronics — cayelectronics.com
Batteries Solid State Marine
Inverter/charger, MPPTs, Cerbo, shunts, Orion, Lynx Victron Energy
Alternator regulator Wakespeed WS500 (Balmar alternator)
N2K peripherals Yacht Devices
Solar arch + hardtop Atlantic Towers

Diagrams attached above (from Electrical Layout - projected.pptx): solar string configuration · Lynx 24 VDC distribution detail · the Always-On bus · bonding circuit. Master alarm panel and Raspberry Pi/RS485 diagrams are on Boat Automation and Monitoring. Still to attach: a clean system/DC/AC one-line and patch-bay layout — nothing in the source deck is a clean single match, may need a fresh diagram. Photos wanted — see wiki-drafts/PHOTOGRAPHY-AND-DRAWINGS-TODO.md (Electrical section).

Plan

We designed the system with Cay Electronics (Portsmouth, RI), who had helped architect the lithium upgrade on the Beneteau and knew the Victron gear. The requirements were simple to state and expensive to meet:

  • Enough storage to go 4–5 days with little or no solar input
  • An all-electric galley (induction cooktop, a combo microwave/convection/air-fryer, a Ninja Foodi)
  • Berth air conditioning for hot, still nights, plus the salon A/C
  • An AC watermaker, refrigeration (two keel-cooled freezers, a refrigerator, and a portable Engel), and a full electronics and entertainment fit
  • Room to grow

We went to 24 VDC for the house system. The Beneteau had chronic voltage-drop problems from undersized wire; the Hylas was actually over-built from the factory, but at 24 volts we stopped worrying about drop altogether. The trade-off is that not everything is available in 24 V — the VHF radios, the Fusion stereo and the Garmin autopilot all need 12 V, and a couple of pieces want 19 V or 5 V — so there is a small forest of voltage converters living behind the panels.

Refit plan as written on the earlier 24 VDC page (April 2025)

Copied unchanged from the earlier 24 VDC page. It is written in plan tense — what actually happened is under Outcome and in the build log.

The Refit plan is as follows:

  • Lithium - www.solidstatemarine.com - 24 VDC, 900ah total capacity
  • Solar Power - TBD - aiming for a combination of Bifacial PERC and CIGS panels for 4+KW. www.bougerv.com
  • Lights - Upgrade all to 24VDC LEDs
  • Pumps - Everything replaced with 24VDC
  • Inverter - 24V/5000W

18 Apr 2025 - The detailed design is basically done to the point where the major components are now on order. Rogan at Cay Electronics was instrumental to helping me refine and finalize this design.

Logical View of the 24VDC Electrical System (Positive side)
Logical View of the 24VDC Electrical System (Negative side)
Logical view of the bonding system

DC Electrical System Design and Explanation We have chosen to completely update the DC system on the boat. We inherited a boat built on a 12VDC electrical system. The lighting was still incandescent, and the inverter onboard was just enough to run a navigation laptop dating back to the 2000's. The batteries consisted of 4 Group 8D lead acid batteries that hadn't been properly maintained in years. In fact one was home to part of the termite nest on the boat.

The lessons from the Beneteau that drove the requirements below are under Lessons learned.

So this translated to some new requirements and background for how the new system is designed.

  1. 24VDC for the boat. The Hylas was wired with much heavier gage wire (3.5 mm - 10 AWG - from the factory and by moving the loads to 24VDC, we anticipate our power environment will be much more stable
  2. We are going to use dielectric grease on all connectors to try to lesson corrosion and then use the crimper from the Ferrule set on all terminal connectors to try to get better crimps and try to limit corrosion. We are also going to use a newish process where the connector is sealed in melted plastic for any connection that might every see water.
  3. We are going to use Solid State Lithium batteries. These are fairly new in the market, but they are being touted as bullet proof. They are more expensive, but if their failure rate is lower, it will be worth it.
  4. We have decided to include another High Output Alternator in the design from the start as a redundant source of alternative power if the GenSet fails. We will wire it up the same as the Beneteau with the regulator unpowered unless we actually want to produce power.
  5. We are going to install the new main engine as 24VDC to keep wiring consistent but the starter battery is going to be traditional. The extra cost of lithium is not justified due to the fact that it still must be isolated from the main bank due to likely electrical imbalances causing sudden and very large transfers of power when combined with the house bank, so additional DC-DC chargers are required to safely operate it in the environment.
  6. We have chosen to leave the GenSet as 12VDC. It is already very isolated electrically and leaving it 12VDC will actually simplify the overall design - it's Alternator is just for it's battery. We might add a 24-12 VDC trickle charger to keep it up, but we anticipate running the GenSet at least weekly to keep the diesel part of it happier.
  7. We will likely only bring a single Shore Power input in as opposed to the 2 installed currently. We will likely abandon the 2nd line in place in case we decide to change it up in the future
  8. We have discovered that we can reuse most of the light fixtures by installing new 24VDC capable LED light bulbs. There are a handful of fluorescent fixtures that we will replace with 24VDC LEDs
  9. We have also found that most of the electronics are 24VDC capable. Notable exceptions are the Fusion stereo, the VHF radios and the NMEA2000 backbone and associated devices. We will install device specific step down buck transformers at the device to deal with 12VDC devices.
  10. We have also decided to upgrade the windlass to 24VDC. The windlass is 35 years old and we honestly don't know what kind of shape it is really in. We also have a seal rebuild kit for it. With a 24VDC motor, it should have plenty of juice to deal with the chain and a heavier anchor.
  11. The refrigeration devices are all natively capable of 24VDC so they will likely run better with lower voltage line losses.
  12. We will use a fuse block to power most of the lights, usb and fan loads throughout the boat since they all have local switches. This will keep the number switches in the main panel down and reserved for the more critical devices.
  13. Solar is an interesting discussion with the advent of different panel technologies. The MPPT controllers are sized based on the tentative plan for the panels - more on this later.
  14. We are also going to be very direct on the bonding system for the boat. There were issues with broken wires and significant galvanic corrosion issues on the boat at purchase time. We are going to make sure we get this right out of the gate. The diagram above shows the plan for the bonding system.
  15. Ground on a boat is often misunderstood and I will admit I didn't have a great grasp of it either. I have to give Rogan at Cay Electronics (my consultant on this project) for finally explaining it in understandable and actionable terms.
    • Each "part" of the electrical system (12, 24, 110, bonding) should be handled on its own dedicated bus.
    • Each of those buses are then tied (with a single dedicated conductor) to a central master grounding bus - this includes the engine block ground
    • There is a single conductor from the master grounding bus tied to the negative terminal on the house battery bus.
    • This provides a single path for each item to reach back to the batteries preventing ground loops which could lead to stray current.
    • If we were planning to use shore power on a regular basis we would need a ground isolation transformer, but we expect our onboard power generation to be sufficient for our needs
    • There is a picture depicting the bonding (and lightening grounding) plan and then a second diagram showing all of the grounding buses and how they relate to one another.
  16. On the Beneteau, the Cerbo GX was powered from the Lynx BMS. This provided power essentially directly from the house bank. The new batteries have internal BMSs so we need to power it from the Lynx Distro bus to ensure there is always power it the house bank is connected. We also figured that the Master Alarm panel was part of our monitoring system, it should be similarly powered.
  17. We will cover the Master Alarm panel and the Cerbo GX design in different write-ups.

Outcome

Status is current to the September 2026 break. The dated detail — what broke, what got rebuilt, what we tested — is in the build log below.

Still open (September 2026)

  • Solar array final wiring and test after the August re-configuration; hinged-panel extension cables; blocking diodes on each paralleled string; full bolt-down
  • Starlink antenna intermittent dropouts; one backfed helm light
  • Stray-current survey (contractor)
  • CAMS v2.0 build-out (digital-input modules, the automation engine) — Boat Automation and Monitoring

Lessons learned

From the Beneteau's 12 VDC system — as written on the earlier 24 VDC page, April 2025:

  1. 12VDC is very subject to voltage drop especially in longer and undersized wire runs.
  2. 12VDC requires very large gaged wiring (cabling) due to item #1.
  3. The Gel Lithium batteries don't like being jolted - 2 of the 6 original batteries have ruptured gel packs rending the batteries unfit for use. Due to the electrical characteristics of different groups of batteries, you can not simply replace batteries that fail in a parallel bank. If batteries fail, their replacements must go into a separate bank which will complicate your wiring system significantly.
  4. The Beneteau's wiring harness was never designed for the amount of electrical and electronics we put on it necessitating adding new wires in many areas to compensate.
  5. Corrosion is a thing - when we uninstalled stuff on the old boat, we noted lots of corrosion in areas we thought were sealed.
  6. The crimpon connectors continued to be an issue
  7. The Balmar Alternator worked well once we made the decision to treat the main engine as either a generator or as propulsion. It didn't like to run both the electrical load and propel the boat at the same time. Also we saw the balmar energize and then drop as the house bank topped up to 100% - it was cycling between 99% and 100% for no good reason. We eventually put the regulator power from the ignition through a basic switch that allowed us to control when the alternator was energized to produce power. We only powered it when we actually wanted to produce power.
  8. In order to keep the size of the main power panel down given all of the extra power consumers on the boat, we installed external fuse blocks and switch panels. We were able to feed these with new dedicated heavier gauge wire, will still giving us control of the devices. We were very happy with how this worked.

From this build — none written up yet. (Lee to add.)

Build log

Build log — Lee's Facebook posts, verbatim

The paragraphs below are copied directly from Lee's own Facebook posts during the build (typos included) — not a paraphrase. Dates are the post date, not always the exact work date.

8 May 2025: So Dejavu all over again. I post pics like these in June as we were starting this same process on the new boat. The good news is this wire is 2x the thickness of the old boat's wiring harness. At 24VDC vs 12VDC we shouldn't have any voltage drop issues. Mechanic worked for several hours unistalling stuff in the engine bay. So far the thru holes appear to be servicable, although bonding will likely involve hose clamps as the original bonding tabs have long since disolved...

12 May 2025: Identified some more of the wiring this morning. Hylas used different colors for different functions. I just need to ID the function for each color. Not quite the current standard, but I can work with it. I built up the DIN rails that will host all the new terminal connectors and installed the 1st one. I am waiting on some new covered cable trays to arrive before I start wiring. It should look nice and neat once I am done.

14 May 2025: More patch panel work today - OK all day - the 2 missing pieces arrived so I could continue in earnest. Many of the wires are a bit short for this layout, so I need to splice on pieces to make everything fit. In the first picture you can see a bunch of loose wires in the verticle bundle and one of the horizontal trays. I need to check on the colors used on the AC side as there are 2 different sets of wire being used and the labels on one set are on the white lines. If indeed they are the hot leads I will be rewiring outlets so at least white and green are consistant (they r already tied to their respective bus bars) If no contractors show up tomorrow I should be able to get most of the boat side of the DC and AC tied back together. The "mystery" circuits will wait til Brownie Hutchins gets back as I need here help to trace wire.

15 May 2025: Electrical update is with that picture.

16 May 2025: Filled on some gaps in my understanding of what I was working with so was able to tie in more of the wiring. The AC system is mostly complete - need to add a couple of circuits and then the main feeds. The DC side is also mostly tied in accept for the bundle hanging out to bottom. I have a tone generator that will help sort that out. I loaded the victron boxes on the boat, their install will happen next week.

17 May 2025: Work slowed down as I had to start tracing wires. I also mounted a new very heavy Blue Box. It's not hooked up yet Also started building out the electrical connections for some of the electronics.

20 May 2025: As promised visible change has slowed as I transition to the electronics side of things. There is still plenty left to do electrically, but the electronics side has more payoff with each connection. It's a bit of a mess towards the bottom as I need to carral the data cables there that I don't plan to cut to exact lengths for now. I started assessing our cable needs to tie the DC bus together and othere than the biggest cables we have most of what we need. We need a pile of connectors but they are easy enough to come by.

24 May 2025: Tomorrow we will turn our attention to the hot water heater and the fresh water pump circuits and maybe start tying the blue boxes together with heavy (2/0 and 2 AWG wire). We have 4/0 on order for the batteries and the inverter/charger circuits.

25 May 2025: More progress today on pulling wire where we needed it.

27 May 2025: We pulled out some more unneeded wire - there is still several more candidates to remove but we are not quite there. We will also be pulling some more circuits tomorrow. I know I've been saying that for several days, but there are too many squirrels running around inside the boat, and I've gotten distracted on dealing with other red herrings, but each one dealt with makes for one less. I can definitely say that the tone generator I bought years ago has definitely come in handy during this phase of the project as we have had to go hunting for wires.... This area is getting closer to being done. I spent a couple of hours tonight updating the circuit tracking spreadsheet taking into account everything we've learned so far. We will still need to build the harnesses that go from the patch panel area to the switch panels, but that is pretty straight forward and we have that already documented in the spreadsheet.

29 May 2025: The patch panel is approaching 95% done. There are far more checks on my tracking/ planning spreadsheet than missing wires.

31 May 2025: I got all of the wire we pulled into the engine bay terminated. Still more wire needed to support lights outside the boat, but we can get the Helm harness assembled now.

2 Jul 2025: We also spent more time consulting w Atlantic Towers on our Hardtop and Solar arch. Design is almost ready to go to production.

14 Aug 2025: DC panel. Started with a blank panel 3 hours ago.. The original paint was bubbling w corrosion so it got powder coated before we left NOLA. But in order to do that I had to completely dissassemble this beast. Took about 3 hours to reassemble. Apparently, I didn't bring quite everything I needed so other than some connectors I ran out of, the final parts will have to wait til we are back in NOLA. And no, I didn't take any original pictures. This was assembled based on looking at each piece understanding its function and then assembling it based on that. As some of the Breakers where involved in the Salsa induced shortout a year ago, we might have to replace them once I can start testing. I have most of the new labels, but we will wait til it's mounted and confirm which circuits go to which functions.

5 Sep 2025: I started making the battery box to keep them firmly in place. As nothing goes to plan, they ended up sitting about an inch too tall so that means the bench area needs to be modified. Thst's for next week. I am having the yard do the final fabrication of the bus bars and I need their table saw for the 2x4 that will attach across the top of the batteries to lock them in place. We will spend the weekend making the mounting plates for cutoff switches, the electrical panels and the electronics. We have a bunch of stuff that our mechanic purchased but has not been delivered and among those items is the heavy cable to tie the batteries to the rest of the system. Loosing patience and the tone of the messages left is getting stronger.

6 Sep 2025: Sticking w the theme of reassembly, we got 2 of the 4 mounting panels cut out. The first is the DC, AC and Master Alarm mounting panel. We need to get these installed and wired in before turning power on. The next panel is the 4 master disconnect switches (Batteries, Solar, Inverter and finally the loads) and the control panel for the GenSet. This maybe even more important as these switches allow us to isolate different major inputs and outputs to safely work on them.

7 Sep 2025: Electronics mounting panel cut out. The cutoff switch panel also gained the windlass breaker. Not shown - all 3 panels have been sanded and now have couple of coats of Matt Black paint. We need to sort out the best attachment option for the electronics panel as the original mounting frame is long since gone. We want to have this panel hinged like a door to make maintenence behind it easier. The hole in the panel is for our new salon VHF radio. It's one of the items our mechanic "has". More on that story as it unfolds...

8 Sep 2025: Finally, I ordered a new bilge control panela and the accompanying switches and high water sensors.

18 Sep 2025: In today's addition, spent some time cleaning a section of bilge that was now accessible (the old galley footpumps), replaced the shore power cabling inside the boat with modern 6 gauge tinned wire. Then we tied everything on the AC side to the Inverter/Charger - (the DC side was waiting on the 4/0 gauge lugs which arrived today)This was a significant step towards bring power up on the boat as until the solar is installed, shore power will keep the batteries charged. Also tied in a few more of the AC lines including finding an oops on a cable I was removing. If I used it, it would have been dead (positive line on the AC circuit was tied to ground on the DC side) that's the problem w using US standard colors Black has 2 uses. Standard European AC wire uses Blue, Brown and Green. That way you don't confuse things. I will double check the other Black wires tied into the DC ground bus now as a result. Tomorrow we can start installing the 4/0 wire and start the process of tying the batteries to the system. We are holding off on the actual electrical panels until I am more confident the patch panel is complete as the panel door doesn't open all the way anymore because of the inverter and is in the way while we are working on the patch panel. We also got word the custom fabrication is complete by Atlantic Towers and they are sorting out shipping. The boat's exterior is going to get a major make-over shortly. Took on the 4/0 wire today - ALL day. That stuff is a PITA to work with. The first picture shows just how big this stuff really is. The smaller bundle is 10 gauge wire. This stuff is stranded but it is the same gauge as the heavier wire in your homes. We are not quite done with this phase as I didn't have the right RED heat shrink to seal and isolate the ends/ lugs. That will be here early next week. I can then tighten everything, connect the batteries and screw down a few things that we left floating to facilitate this part of the process. There are a bunch of fuses not yet installed so we can control where power is applied once we start up.

21 Sep 2025: The red heat shrink arrived so we could wrap up the main bus cabling. Got it assembled and remembered the switches came w insulation boots so I took it apart to install those. They didn't fit the 4/0 cables but the fit the 2/0 and 2 awg cabling. We pulled out some more wire to allow us to reuse it and lighten the load of dead wiring. We were able to remove about 60% of the old speaker wire - the stereo was on the other side of the boat and reuse it. We also started installing the USB charging ports and fans. Some are wired, others still need to be tied in. Yesterday was a bit frustrating as when I was trying to ID a fan wire I discovered that I had a short (positive and negative were tied together somehow) that led to several hours taking apart the negative bus bar connections multiple times - I was having a user based issue with the multimeter that was not helping matters any. We actually had a couple of issues, but they are resolved. This met my requirement to verify that part of the wiring. There are still a handful of circuits still to run and terminate, but they are mostly quick tasks.

23 Sep 2025: Battery bus bars are installed. The yard work's precision was no better than mine was on the first boat. Oh well. Right now the main bus is complete. The fuses to protect each section (7) are not installed so the boat is not powered. I still have to install the panels and we are still chasing the last few circuits.

24 Sep 2025: Discovered I installed a shunt backwards (in line device to determine current flow) so I need to take apart the main DC battery line and reconfigure it as I can't install the shunt the right way where it is. Being backwards it would have report charging instead of discharging.... oops.

25 Sep 2025: Today we installed our new Smart Shunt. This one incorporates functions from 2 pieces we used to use into 1. This one takes power to operate and once the batteries see a load demand they turned On. This is the monitoring interface in the dedicated battery app. Was surprised the batteries were only at 50%, but once the inverter/ charger is powered up, it will charge them up. I hung the mounting door for the AC, DC and alarm panel in preparation for getting those connected also.

26 Sep 2025: Today we reached the point of having everything to put the bilge pump system "together" electrically. 2 of the pumps are still awaiting fiberglass work to wrap up, but the wiring is now in place for them. The 2 pumps under the Salon sole are now awaiting final power to be turned on back at the panel. We ran a new 5 conductor line from the bow all the way to the engine room to support the bow pump.

27 Sep 2025: Update - good day - I'D 7 of the remaining unknown wires in the patch panel bay. That leaves 4. I am comfortable w proceeding. They are not connected so they don't pose a risk for now. As we connect and lights and stuff their purpose should become apparent.

30 Sep 2025: We started with actually opening up our new engine (pic attached) to survey what we were dealing with and make sure the plans going forward included what we really needed for the motor. We learned a couple of things that will drive us to make some minor changes - for instance the engine has 2 alternators - one for the house (planned) but also a separate one for the starter battery. Didn't expect to see this one, so I need to add some wire to provide a means for it to maintain the starter battery. I need to revisit the charging link from the house back to the starter battery now.

1 Oct 2025: Because the batteries are a bit tall - missed it by an inch I had to recut the salon couch cushion bench as it wouldn't fit as designed. We did that also. That freed up floor space as it's an8' long horizontal surface. The pieces were stored in the aft berth, so once they were out of the way. I could turn my attention to that space and resumed wiring there. It doesn't sound like much, but I cut holes for and installed 3 new AC outlets (2 needed new wire), a USB charging station, a fan and a light. There is a fan and a usb charging station left to go. We also finished routing the solar wiring and data cabling and the hot water heater wiring so those items can be connected once physically installed.

3 Oct 2025: Still to do - 1. Sort out lights, switches etc in the engine room area - there are a bunch and this will take a while. 2. Deal with systems/ electronics under the master (aft berth), 3. Install water maker, the washdown pump, and the windlass wiring under the fwd port berth. 4. Wrap up the wiring in the Lazzarrette - this includes our shore power receptacle and cutoff switch. At that point I can get the electrical panels installed and wired up. So for those keeping score 1. Electrical - 2 more circuits need to be installed, the engine room area, the shore power and cutoff (lazarette) and finally the breaker panels.

4 Oct 2025: Today's update. Mostly forward. We tackled the wiring for all if the lights controlled by the switches around the engine room "island" as well as some of the other things in there (pumps, etc). We did get everything identified and started reassembling it. We decided that the original 1990 switches were badly corroded so they are getting upgraded to include proper 3-way switches in place of "it will work" wiring. Installation of the new switches is set for tomorrow. We will also start timing in some of the other things in there like smoke/ heat sensors and the 3 oil/fuel pumps.

5 Oct 2025: Update - well we didn't get as far as we wanted today. Each switch hole had to be recut - thank goodness for a multi tool. So that slowed things down a bit. Lowes also didn't have everything we needed in stock between the 2 stores we tried so we had to order the difference. Additionally to properly wire up the 3-way switch pairs. We needed some additional multi-conductor wire. So wrapping up the switch project will be at least Thursday. We need to check wiring diagrams for the heat & smoke detectors before we wire them in also. We also decided that we wanted "wall switches" for the salon lights so we bought some more stuff to make that happen. For those keeping score 1. Master berth lights - convert 2 way to a new 3 way circuit- we can turn them off from the berth now, 2. Master head sink, 3. Proper 3 way circuit for the shower - it was basterdized, 4. New 3 way circuit for engine room lights - replace 2 different switches, 5. New 3 way switch for galley passageway - replace single switch, 6. New salon switch for red/white lights, 7,8 & 9 new 3 pos switch for remaining salon lights, 10. New door switch for Tool Closet, 11, 12 & 13 replace switches in forward berths and remaining head.

11 Oct 2025: We also updated all of our reference paperwork to include a new 1-N list of all of the circuits (and yup we found duplicates etc) and the powerpoint logical diagrams. This will help as we prepare to wire up the breaker panels - this coming week. So we got all of the inside the boat stuff related to our 2 electric winches temporarily assembled and squirrelled away above the ceiling. This involved pulling power and data cables through the ceiling. I also started prepping the breaker and control panels for hookup - the alarm panel and the AC panel are mounted and then we mounted the 3 wiring harnesses to link the 3 panels to the patch panel bay. The DC panel is awaiting a final breaker before we mount it as it is MUCH easier to swap Breakers sitting on a table verses mounted in the door panel. The picture below looks like chaos but once all of those wires get their connectors and then tied to their respective breakers it should clean up quite a bit. There are still some more electrical hookups in the engine room, but as part of the work involves the wiring harness for the Helm pedestal so that became a distraction and I went off in a different direction. (I guess I am not quite ready to finish up that area)

13 Oct 2025: Brownie Hutchins took on swapping a couple of Breakers in the DC panel and now that it is properly configured it is now mounted awaiting hookup.

21 Oct 2025: We temp connected the inverter/ charger to shore power and the batteries to charge them up. About 40 mins later there was an odor. We stopped the charging and did some analysis and decided the help I got from the yard on the bus bars didn't really help, so we have some rework tomorrow to flip the bars end for end and re-drill the stud/bolt holes more accurately and see if we can't get better connections. After yesterday's debacle with the battery bus bars, I redid them myself using plywood templates and they are now right and safe. See pic. We recovered about 10% of battery charge in the late afternoon before turning everything off. Not ready to leave it all running while we are not there quite yet. We'll resume charging in the AM and should easily have full batteries by the time we leave tomorrow. We also built the custom data cable so we can monitor the batteries through the boat's monitoring system. Although it works, the software/ firmware side is still evolving. We will be the test install going forward as that continues. Our friend spent the time while I was working those projects getting the DC Breaker panel wired in. He got most of the panel terminated and has started temp hooking into my patch bay. We are going to start working circuit by circuit in the coming days to make sure everything is right.

22 Oct 2025: We worked through the process of bringing the DC panel online, which involved installing a really big fuse, and then getting the battery protect box's firmware updated and then converted over from 12v to 24v. So after an hour or so of that fun, we decided that lights were the first order of business. So we pulled out the supply of blade fuses and decided to just go for it. A bit of an oder later we stepped back and decided to take a more measured approach. We removed a bunch of jumpers that were connecting the light wires together in the patch panel and decided to go one circuit at a time. The good news is we saw almost every light on at one time or another and documented who was who. The bad news is that there is a group of lights that appear to be tied in a couple of ways at the same time and that's creating issues. So tomorrow I get to try to get to the bottom of that. They are all the lights on the starboard side of the salon and the head on that side. We didn't expect to see them all come on, so clearly I missed something behind the scenes and I just need to track it down. The Batteries were at 98.5% charged when we left, so we were quite pleased with that process. Tomorrow we will force an equalization procedure on them to make sure they are properly balanced and ready for many years of service.

24 Oct 2025: Today the lighting on the boat started to behave better. We tracked our issue down to a floating ground. Basically everything we were struggling with was tied to the same big black wire - good. But that black wire was not connected to the other Black wires on the boat. So nothing was working right there. We found a rat's nest behind the Salon Air Conditioner. But we couldn't get to part of it without unistalling the air conditioner. Taking apart the cabinetry was bad enough. So we tracked our issue down to this big wire that we still don't know where the other end connects to. So we cut everything free of that wire and installed a new ground run from the main ground bar for the boat. We also cut the bundle of all of the positives (lights, fans, etc) apart so we can better group them and be sure of what is what. We have a few unknowns, but so far everything we think should be working is.

25 Oct 2025: Along the way we threw away 6 old light fixtures whose guts were broken in some way. The process of discovering those while trying to bring lights back online didn't help us along. On top of that we discovered a wire embedded in the wall between a switch and the light had a screw embedded in it and was severed. That discovery took a couple of hours.... There are still some lights not working that should be - we should be able to solve that tomorrow. The leaking hatches are a different matter. We have also decided to swap several fixtures for new brighter ones. Finally, there are several lights we thought were on switches that are not. So we need to sort out which ones need switches on the light fixtures and maybe swap some others around as a result.

26 Oct 2025: Shortish day today. Bunch of little projects to deal with unfinished work from this week. Other than the Bilge panel, which appears to have issues, we were able to get a light switch installed, shift to a surface mount cable for another light switch, add a light in the patch panel area and put a small resettable fuse inline with the part of the boat's electrical system which is always powered. We got replacement LED bulbs - we thought we ordered 24V bulbs but 12V bulbs showed up for our floor lights and even though they are LEDs, they didn't do well with 24V's and were the source of some of the odors we ran into when we first powered up. Unfortunately you can't put the grey smoke back in the electronics once it escapes. Tomorrow, the plan is to wrap up the lighting on the starboard side of the boat to include re-assembling the cabinetry that we pulled apart to access the wire trays. It will take most of the day clean that mess up. We have one more set of door activated switches that are not working and I am almost positive it's related to the ground issue from earlier. These switches are not part of the boat's original wiring, so when I took care of the rest of the ground issue, these were probably missed because they are located elsewhere.

27 Oct 2025: Pretty good day today, started cleaning up some of the wiring chaos from this weekend's troubleshooting. Got 3 cabinets put back together, sorted out the misbehaving door switch lights in a couple of the cabinets and we were able through a combination on a new light fixture and some more bulbs now have all of our floor lights (red) now working. We have run into an issue with some of voltage converters that convert from 24v down to 12 v. They all burned up. There are several theories right now as to why, but bottom line is they are all (3 of them) paper weights. We have some trouble shooting to do to get to the bottom of that mystery.

29 Oct 2025: Yesterday we focused on reassembling cabinets we dissassembled to sort out the floating ground issues. This turned into a grueling puzzle ordeal as some genius created a unbelievably complex interior where pieces barely fit through openings and then have to be contorted just right to go into place. And yes, I ended up with extra support pieces. I am not pulling them apart to figure out where they should be... We also started working on the 2 remaining lights that were not playing nice. One was an incomplete connection - easily solved, the other was a severed wire that happened back when the propane locker was cut out. Fixing that turned into more of a chore as the cable tray at the back of the boat had been filled with a caulk plug...

31 Oct 2025: The 2nd is the smoking (literally) gun pointing to cheap Chinese parts from Amazon. The 3 pieces with the burn labels are 24V to 12V voltage converters. They didn't survive power on. These are important as there are several pieces of electronics that are not available in 24V. We are re-architecting this part of the electrical system to come up with a more robust solution. We have the beginnings of a solution, we are just doing some more analysis before we spend some more money.

3 Nov 2025: We then moved onto pulling the wire for the forward Hull Shield controller and then mounted it and several other things in the space under the salon couch. This is the 3rd space and the one that is going to be usable as additional storage. This space is also where the mast connections are made so we will be back in here in the future. In the next space over, we installed the 110VAC outlet we will use to power our portable Refrigerator/ Freezer. We now have 3 more AC outlets still to go - the one in the galley, the scuba compressor and finally the cockpit outlet. I have been putting off the gally outlet as it is going to be quite difficult to reach. The other 2 areas are not ready for the install.

4 Nov 2025: While they were doing that, I took on the misbehaving bilge pump system. It seems I made a couple of wiring mistakes. I was able to verify the panel was working properly and then retrace the various wires and tracked down 6 mistakes in the system (38 different connections for 4 pumps, 4 float switches and 2 high water alarm switches and finally the panel lights 2 more). We spun up 3 of the 4 pumps (the last one isn't installed yet). The pump panel lights are working so it was a good day.

5 Nov 2025: We also wrapped up a few loose ends in the engine room. We are still chasing unhappy electrical grounds. No smoking guns there. We also may have an issue with my 4+ year old multi-meter which is not giving consistent readings. So that is one more boat environment tool to upgrade.

14 Nov 2025: While we were in places where people aren't meant to be, I also got the new solinoid for the windlass installed. Once the chain locker and windlass support is done, we can start reassembling the ground tackle.

16 Nov 2025: We have access to a table saw so I can get some more carpentry done and while I am doing that, my helper is going to make some adjustments to the patch panel area and start finalizing that. Lots of progress planned for this week.

19 Nov 2025: In Today's boat news, the AC electrical panel is now reinstalled with several new appropriately sized Breakers and its wire harness is also terminated at that end. We discovered that I have some undersized wires in the DC panel wire harness and that we will take on tomorrow.

21 Nov 2025: Boat update...my electrician helper's OCD has been busy the last couple of days so the breaker panels received a make-over (truth be told they are better configured for our expected use) and we also changed how a couple of the biggest loads are powered so that rippled through the panels.

23 Nov 2025: The DC panel is also live. We have more ring out to do, but we have progress. The AC panel is almost live. A few more connections and we can remove the extension cord that has been run through the propeller shaft tunnel for months. Easy day. More painting today and more electrical work. Tomorrow we will start ringing out enough of the 110VAC system to get off the extension cord. We will also get some more painting done.

26 Nov 2025: We also got the first boat based 110vac electrical outlet working. We will be getting the remaining normal outlets turned on once we get back also. There are still more devices to attach to both the AC and DC systems, but the extension cord powering the inside lights and providing power for tools should come out shortly.

2 Dec 2025: Good day for our first day back. We got more of the electrical circuits powered up and unplugged the long extension cord from the inside of the boat. We are still connected to shore power but we are plugging things into the outlets we installed inside the boat.

3 Dec 2025: We reached the point that the electrical panel door could be closed. There's still more work behind there - at least another full day, but my helper wanted to see progress. Pic below. As part of that effort all of the 110vac outlets (that are installed) are now working. There are 5 more circuits awaiting parts or further work still to be tied to thier recepticals or devices. All and all it was a good day. The yard should be working on the engine/ fuel system today and we will be hooking the alarm panel harness into the patch bay.

5 Dec 2025: We made more progress in the electrical front with the alarm panel harness now being complete. And that then led to reordering the boat side of the alarm patch terminals, which led to the realization that we have a bit more work to do on that front before we can call that one wired up. We did some more work to bring what we are affectionately calling our "Always On" bus online. We have all but 2 devices online and working. This bus powers the monitoring systems (alarm panel, electrical monitoring, fire, smoke) and the panel lights for the electrical panels. We have one more section to setup, but the pic below shows the panels in a more functional state. Our next big task is to create all of the custom labels. The company that manufactures the panels offers the service, but their distributors won't take orders because it's too much work. We are looking at alternatives (of course these are non-standard sizes)

6 Dec 2025: I did some panel work to prepare for mounting the ship's IT infrastructure as well as the electronics in the Nav station. The electronics panel also got trimmed to better accomidate being mounted in a door frame which I will make while we are in FL fir Christmas. OK promised pictures of engine mounts and the first of the ship's IT Stuff is installed

8 Jan 2026: I got the wires unwound that had been repositioned for the motor, alternator and the Alternator Regulator. There are 1 more set of wires to run for the engine alternator for the starter battery. Pulling the new wire harness for the new alternator Regulator was a PITA.

30 Jan 2026: While prepping to install the electric winches, we discovered that a layer of material used to create the fiberglass "shelfs" for the winches never set up. Yesterday, that was patched so we can continue the winch install. We got the 2 winches bolted down before we quit so the holes don't leak in the rain today. We plan to wire them up in the next few days. I got the electric winches all wired up - need to configure once they are powered up and then the last few bits can be fastened on place.

27 Feb 2026: We tackled getting the electronics mounting panels into the hinged frame today - or should I say tried to. Fought with the hinges for several hours and decided i could live with the outcome - there is binding introduced by the original frame being rounded. Anyway we were already to screw the panel holding all the radios etc to the new hinged frame, only to discover it never got cut down - originally it was just going to be screwed in place, not mounted into a hinged frame. Well we sized it up and it quickly became apparent that panel v1 was not going to work. 2 hrs later panel v2 has its 1st coat of paint and is drying behind the camper. Yes we checked fit before painting. It will be ready to rebuild tomorrow. 1 step forward, several steps back.. .

28 Feb 2026: Electronics panel. Everything is mounted accdpt a MIA A-C outlet (single plug) and the mic mount.

11 Mar 2026: We made some more progress outside terminating wires and mocking up the new helm station. Also installed the pad eyes that the anchor road will be fastened to. My anchor road will be attached to my boat.... The pic is the mock up of the helm station panel. Large hole upper left corner will be 2 rows of rocker switches and push to reset breakers. Since our chart plotters go on swivel mounts, we decided to use the extra space for a deep storage cubby. The circles represent usb, 12v, volt meter, and a reset able buzzer tied to the alarm panel. The engine on/start/stop controls are in the upper right corner.

12 Mar 2026: What statted out with gale firce winds became a nice day. Today's installment is all about wiring. First of all with the arrival of our anchor chain being imminent a working windlass is becoming a critical path item. The windlass consumes ALOT of amps in short bursts. So much so that regular switches would melt. So there is a solinoid in the wiring schematic. There are 2 sides to this device. The first side has 3 connections for the battery power in and the 2 positive outs. This is 2/0 gauge wire. The motor direction is determined by which of the 2 outs gets power. The second set is the control lines. A neg and 2 positives. This is where the remote switches connect in. Again which ever side sees power closes the soliniod on that side sending power to the windlass. In a setup like ours where there is more than 1 set of up/down switches, the power that gets routed through the up/down switches is often drawn from the battery connection via a much smaller gauge wire on the soliniod and routed to both sets of switches. I was expecting this configuration. Not what I found. There was a 4th wire that was connected to the battery connection and the lines providing the power to the switches where just tied together. WTF. After 30-45 mins tracing wires we found both the 4th wire (yellow) and 1 of the 2 wires that were tied together (blue) both unterminated in the power patch bay. Wires 1 and 2 trucked right on through as I would have expected. So we opted for a safer (more correct) approach of providing power to the blue lines from a fused point in the patch bay and removing the yellow completely. With that solved, we continued towards the helm wiring and never made it out of the engine room patch area. Way back when, I terminated lots of things in there, but never truly wrapped it up given the helm switches didn't exist yet. We advanced that ball further, although now with most of the wiring in place running up to the helm, all of that wire needs to be terminated and matched to inp¹uts/outputs or devices. There's likely 30-50 circuits (data, 24v, 12v) involved so we have more work to do before helm switches can test things.

17 Mar 2026: Spent the last 2 days back in the familiar place of the electrical and electronics patch bay. It needed some TLC to clean it up as we have been adding in the switches in the Nav station and the Helm (wiring only as we are still fabricating the mounting plate). The yard help is MIA - sick/ more pressing priorities. There is at least a full week of work to wrap this area up to make it fully presentable.

18 Mar 2026: We are going to do some more wiring tomorrow to address some shortcomings in what we've either inherited or done ourselves. This is mostly swapping some of the wiring we've already pulled - it should be straightforward as we can use the current wire to pull the new stuff into place. 1 brand new 3 conductor for a 2 conductor (I missed that one of my AC lines was only 2 conductor - so it needs to be swapped for a 3 conductor). That 3 conductor is a lighter gauge than the next one in line - that heavy gauge is way over kill for its use and is in the same cable tray. That line will then in turn be swapped for another line which is ridiculously large (this is the one we inherited) Along the way we need to pull at least one new signal conductor for another control relay. There are also some additional connections to be made to bring the tank senders online. So busy day tomorrow but no creative engineering needed for tomorrow's plans.

20 Mar 2026: Also spent some time with the battery manufacturer on the phone and online. We've been chasing a programming/ configuration issue within the electrical system that was resulting in a high voltage alarm. We think we have the right settings now as the solar controllers are backing off as they should be.

25 Mar 2026: Also we ran the "portable" AC all afternoon with a nice sunny day here. Pic below shows the electrical system status as we left the boat after 5pm. Pretty happy with our setup so far.

29 Mar 2026: We also discovered a couple of the salvaged electronics pieces supporting the alarm system where InOp so we replaced 1 with a spare and oreded a replacement for the 2nd. Not sure when they got fried, but no pump alarms without them.

30 Mar 2026: Got some more specific electrical/ electronic wiring tasks done. We have a pretty good list of not quite done connections that we are ticking off as we close things up. Today's focused on engine and GenSet stuff. We also needed adapters to attach fixtures to our new AL structure. Most of the standard stuff comes with 1" mounting brackets. The AL pipe is 2"+.

1 Apr 2026: We got sucked down a Rabbit hole on the GenSet electronics when we saw NMEA2000 on a pilot label attached to the computer that controls the GenSet. We want the GenSet to be on the N2K network for monitoring (and no control). Anyway finding a dealer that has a clue beyond it's a Generator is proving to be challenging. The company wants you to work through thier dealer network.

3 Apr 2026: We have been working towards bringing some more of the alarm panel online - discovered some issues along the way that we are addressing. We have also been working on tidying up some electrical and electronics stuff that wasn't wrapped up earlier.

20 Apr 2026: We also did some more engineering work on the electrical system focused on the starter battery circuits. We hadn't put a lot of effort into this part of the electrical system as the wires are extremely heavy gauge and they would get in the way of the final installation tasks involving the main engine.

22 Apr 2026: We started assembling the 12 VDC starter system yesterday. Pretty happy with the progress although the Orion DC-DC charger isn't behaving. Unfortunately we have to take everything apart to get to it...the good news is everything is terminated and labeled now, so it's not the end of the world.

24 Apr 2026: After switching out a defective charger and adding another shunt for better monitoring our starter battery bank is fully online. There is a final data cable needed that I hope to install tomorrow.

27 Apr 2026: Today was focused on hacking the Lithium Batteries 2nd Data bus. Why you might rightly ask - well the primary one goes to the Victron Cerbo GX and it works great, but only gives us summary and high/ low type data. It doesn't give us direct insight into each cell in each battery. We want to monitor this over time to try to identify issues before they become critical. Also the battery Manufacturer/ Distributer is also interested in those detailed logs. We successfully ID'd the correct pinout (only 3 on an 8 pin connector), ID'd the correct data rate (9600 baud, RS485), and then ID'd the correct data formatting and protocol. We have ID'd a couple of issues which we confirmed with the manufacturer and have a way to resolve them (all of the batteries are assigned the same bus ID). So tomorrow, we can reassign the bus ID's and then finish daisy chaining all of the data inputs together and then run that into the Raspberry Pie and then start logging data. We will also build a cool interface to be able to look at all of the cells in a tabular view to help us compare/ track data.

5 May 2026: We also got the 2nd battery data network hooked up and as of tonight 5 of 6 batteries are reporting. Also discovered the first leg of our Positive cable from the batteries to the fuse was hot (140 deg). Something is wrong with it's connection. Will dissassemble tomorrow and troubleshoot. We were pumping 100Amps through it from solar at the time.

6 May 2026: The batteries are now reporting on the 2nd data bus. Hopefully, this will allow us to track down some of the odd readings. We did find the root cause of our hot cable. That is now corrected and we should be fine going forward.

31 May 2026: More wrap up tasks today. The engine room wiring is almost complete. Brownie Hutchins got to learn how to do some waterproof electrical connectors and made a bunch of connections while I was troubleshooting other things. I also got the electronics panel almost wrapped up in the back. Have 2 more wires to confirm and it will be done.

2 Jun 2026: The Starboard side of the engine room is also basically complete with the fuel system being all tied together, the heavy capacity Balmar Alternator being tied in finally and cleaning up the wire routing. We also got the oil change pump and fuel polisher pump wired in and tested. We got some more work done at the nav station with more electronics connections finalized. All in all a pretty good couple of days. We also successfully completed the trouble shooting on the berth A-C. I had installed it last week but it was throwing errors. The company is purchased it from 6 months ago was very proactive and after a bunch of pics, a few videos and some hands on work on my part we traced the problem down to a connector inside the control panel that was sitting on the wrong set of pins. Easy to fix once we got there, but how the unit made it to us with it misconfigured after being tested - big sign on top signed by the tester.... I don't know, but a simple fix. Unfortunately, to reach it, I had to partially uninstall the unit as the control box was mounted before mounting the AC in front of it.

30 Jun 2026: Attempted to swap the scuba compressor back to electric as part of today's activities. My PTSD issues with this thing got worse. For those reading along you might remember that the "new" electric motor showed up with a broken foot mount. So they took pity on me and sent me another one. This one showed up in tact, but without the extra sensor wiring. Well today was the day to rearrange all of that. 1st off the broken foot motor is a 60hz, 220vac European plugged version. Well that's not ideal. The 2nd motor is a 230vac 50hz version, also European plug even less than ideal. After going round and round with Google AI the plan that I executed (took all morning) was to swap the electrical panel containing to sensor wiring from the 60 to the 50hz motor, order a step up transformer and run the 50hz at 60 hz at 220 on my 110 boat. I don't completely understand how i can do that if the power curcuit i installed still isn't big enough (70A breaker required) but it will do fine with the transformer. But I'll go with it.

2 Jul 2026: 4. Neither A-C is working. The old one is tripping the electrical syste. When it comes on... the new one has the same error as before.

4 Jul 2026: We wired the Salon A-C directly to shore power (bypassing the boat's electrical system) and it's running just fine. I need to spend an hour or so changing how shore/generator power is passed to devices not running on the inverter now based on this experience (the Scuba Comoressor likely won't work either in the current wiring configuration).

8 Jul 2026: The starter on the main engine is a beast. Turns out the original install was 2 batteries in parrellel. That's not how we are wired anymore. Swapped a smaller battery (group 24) for a Group 31 AGM battery but the battery didn't have a sufficient charge at purchase time. We'll see today if it's enough.

10 Jul 2026: The main engine got $200 in New cabling for the starter to try to solve a voltage drop issue only to still have the same result. We are at least seeing a couple of weak cranks now as opposed to not even a full crank last night. The yard is going to have to call on someone who has a clue, because they don't..

11 Jul 2026: The good news is we now understand the root cause of our air conditioner woes with a clear way to gain functionality. The fan unit has a hard line m it of 28vdc. I discovered this after disectioning the original motor and determining the motor specs once I could find the make/model which was inaccessible without taking the housing apart. Took a picture of the markings on the motor housing and Google chrome's AI I'D it and brought up the specs. Our boat is a 24vdc boat based on Solud State Lithium batteries. These batteries when fully topped of sit at 29VDC. They do drop down as the state of charge drops, but fully charged they exceed the blower's high voltage cutoff. Yesterday when we got to the boat, the batteries had dropped to just under 28vdc overnight and the unit operated fine. A voltage regulator is on its way and I will install it just before the blower and that will keep the blower happy. We'll take the win. The high voltage on the batteries has caused us some grief in the past, so I was digging along those lines.

14 Jul 2026: I did install the voltage regulator on the A-C. It will work til something more appropriate shows up. I was not happy with what they sent me so I ordered another blue box (Victron...)

19 Jul 2026: This afternoon we took on getting the mast electrical connections sorted out. For now my 3 way deck light circuit is not working as planned (light can come on, but not correctly from either switch - likely incorrect switch body issue) and our loud speaker is InOp. This horn filled up w water several months ago, so that may have damaged the interior. We verified wiring is correct - discovered power to one of the radios was not as it should have been with a disconnected wire and not wired into our DC panel as planned - it was drawing power from elsewhere. So we had to correct a couple of issues prior to suspecting the hardware. I will be testing v the loudspeaker via different means tomorrow.

22 Jul 2026: We have to do some work to integrat the 2 new panels electrically and then wrap up 3 more connections on the back (stern Nav light, Radar power and our dinghy alarm loop).

23 Jul 2026: Well after a day plus of troubleshooting to include a Fubar Solar panel tester, we have finally achieved full power. The issue i ran into was 2 connectors that where made months ago never got properly seated internally. Once I started with a good solar tester, I was able to verify all of my wiring and even after swapping out mppt charges, I finally started looking at connectors and these 2 which worked until I pulled them apart to integrate the new panels in place must have come loose internally. When I separated their housings, the internal pins came right out. I properly seated them and low and behold power was flowing. Pic below is our energy monitoring screen. Of a theoretical limit of 4kw, we are showing 3.4kw. 85% efficient in New Orleans. Should be even better once we get further south.

28 Jul 2026: I also hopefully solved an issue with some of our navigation lights which were miswired in the electrical patch bay.

2 Aug 2026: I also continued chasing electrical cleanup with sorting switches that are not behaving as intended. I think we got 2 more sorted. We also replaced the bow red/green navigation light. So once i rebuild the mid mast light harness plug we'll have all of our USCG lighting working properly.

8 Aug 2026: 3 days of work and the helm station of now almost wired and working. Of course being IT, the Garmin IP network is not working. That just effects the RADAR. All of the switches work as desired and the chart plotters are recieving engine data. I have a cat5 tester so I should be able to get to the bottom of the issue quickly.

12 Aug 2026: I also started the electrical panel cleanup. That led to several WTFO moments that we are still sorting out.

16 Aug 2026: On the electronics/ Electrical side, I got the Garmin Network finally assembled. I had issues with the RJ45 jacks, but after reterminating everything to do with the helm chart plotters, data is flowing and software is now updated. I need to spend some quality time with zip ties to secure all of the wires now.

20 Aug 2026: I spent the day continuing to update our as built documentation. That of course lead to enumerating all of the various control relays which then lead to another push to finally get them all configured and hooked up correctly. Made good progress and all but 2 are now ready for use. Corrected a few mistakes/ that didn't work as planned issues and was able to test function on most of them. We have over 20 relays in the environment that we have some control over and they perform several different types of tasks beyond just turning things on/off as we needed them to do creative things like connect a ground given a positive input or turn on the 110VAC hot water heater based on a 24VDC signal. Etc. A bunch of the relays are controlled through automation based on the overall environment status. For instance, the hot water heater (A significant energy consumer) is now being controlled in such a manner that only comes on once the batteries are full and there is still solar power available. It can also be overridden by a switch if we want to use it anyway (like the GenSet or Main Engine is running).

21 Aug 2026: Got a few more tasks done today. Got 2 more relay circuits done today and then I took on repairing the bonding system. On boats - especially in Salt water, electricity flows in ways you don't expect. So in order to combat damage done by "stray current", you explicately electrically tie all of the metal bits together and then connect that circuit to a sacrificial anode often a chunk of zinc. In this case there is a sizable plate of zinc bolted to the outside of the hull. There is a bolt that penetrates thru the hull and into the the zinc plate. The bolt protrudes into the bilge so that the bonding circuit can be secured to it. We likely had some issues with stray current until I tied the last few pieces back together and added the new pieces we've installed to it. I have arranged with a local contractor to do a stray current analysis hopefully next week so we can verify we don't have any other issues.

31 Aug 2026: We also have a data/electrical issue with the starlink antenna which is giving us a periodic drop outs and a light that has a backfeed issue. For the light, I need to get backinto the helm wiring harness. I suspect the issue will be apparent once I get in there and the starlink issue requires getting high up on the ladder. I also need to put some more bolts through the rails into the panels to fully secure them but they won't go anywhere while we are sitting in the slip.

Dated notes from the earlier 24 VDC page (May 2025)

Copied unchanged from the earlier 24 VDC page.

14 May 2025 — Patch panel bay layout planning: - The original factory wiring is mostly hooked back up except for the lights and 12 V sockets - they are all too short for their intended homes

15 May 2025:

The factory harness is done on the DC side except for the grounds

I need to do the AC side first due to reusing the color Black - I want to make sure that all of the HOT AC lines are accounted for before committing the remaining blacks to the DC Ground Bus Bar.

Still need to trace the non-factory wiring.

The bundle on the right side of the picture is related to the mast wiring harness. There is a terminal block mounted under the forward salon seat where this harness terminates. Based on that fact, we can move forward with another terminal block mounted against the forward bulkhead in this electronics bay that will then feed the navigation switch panel.

Stereo speakers - the Master Berth and the Cockpit speakers are now terminated. The Salon speakers need to have new wire run that terminates here instead of the old Radio location.

There is still one set of wires (Grey) that are spliced together that need to be ID'd - I think they are likely the navigation lights - but TBD.

16 May 2025:

In order for the Yacht Devices Run Time model to monitor the bilge and fresh water pumps, it is expecting the NEG side of the circuit to run through it. This is the reason I was hesitating on hooking up all of the DC negatives. I have since realized that we are likely running new wires to the 3 pumps in question, so I went ahead and just tied in all of the DC grounds today. We will worry about the 3 pumps when we run new wire to support them.

29 May 2025: finished running the new wire supporting the planned circuits and spent 5 hours terminating everything in the electrical panel area including the majority of the non-Victron related master alarm panel circuits.