'''29 Oct 2025:''' We also replaced the gaskets in 2 of the 3 sea strainers.  Brownie Hutchins had already cleaned the lenses.  The 3rd one is awaiting parts I ordered today as the yard only got the kits for 2 of them. We ran some more bilge pump hose.  Apparently I needed more than we bought, so there is some more now on order.  I will also start running sanitary hose for the black water shortly. Today's pic is one of the hoses for the 2 aft hatch (lazzarrette) deck drains.  These have got to be the worst shape of anything we found on the boat.  At one point they might have been black or maybe white and they are steel wire reinforced, although that wire is long since disintegrated everywhere except the drain and thru hull fittings which had to be cut still with wire cutters.  One of the hose clamps was so bad, I had to torque it off using a set of vice grips.
'''29 Oct 2025:''' We also replaced the gaskets in 2 of the 3 sea strainers.  Brownie Hutchins had already cleaned the lenses.  The 3rd one is awaiting parts I ordered today as the yard only got the kits for 2 of them. We ran some more bilge pump hose.  Apparently I needed more than we bought, so there is some more now on order.  I will also start running sanitary hose for the black water shortly. Today's pic is one of the hoses for the 2 aft hatch (lazzarrette) deck drains.  These have got to be the worst shape of anything we found on the boat.  At one point they might have been black or maybe white and they are steel wire reinforced, although that wire is long since disintegrated everywhere except the drain and thru hull fittings which had to be cut still with wire cutters.  One of the hose clamps was so bad, I had to torque it off using a set of vice grips.
<gallery widths="220" heights="165">
File:Plumbing_2025-10-29_772593.jpg|29 Oct 2025
</gallery>


'''3 Nov 2025:''' The first was removing the down stream hose and check valve associated with the emergency bilge pump.  The check valve was basically not functional.  the fitting consisted of several pieces of brass which of course loosened in the wrong order.  A torch and hammer later, I finally liberated them from the hull and we can then look at how to hook up the new hose which we still have to put in place (as well as remove the old hose).  The picture is the reassembled fitting.  You can see from the blue dust, that it was slowly disintegrating due to galvanic corrosion and it was the source of the blue flakes in the water yesterday.
'''3 Nov 2025:''' The first was removing the down stream hose and check valve associated with the emergency bilge pump.  The check valve was basically not functional.  the fitting consisted of several pieces of brass which of course loosened in the wrong order.  A torch and hammer later, I finally liberated them from the hull and we can then look at how to hook up the new hose which we still have to put in place (as well as remove the old hose).  The picture is the reassembled fitting.  You can see from the blue dust, that it was slowly disintegrating due to galvanic corrosion and it was the source of the blue flakes in the water yesterday.
Line 223: Line 227:


'''9 Jan 2026:''' Today continued the running gear and fuel system work. We received the fittings and hoses we needed (or at least What we thought...) this morning so we did some more work on the deisel fuel plumbing.  We got the fikters/fluids changed on the GenSet and slid it back into place.  This allowed us to get to 2 floor panels we hadn't been able to get under yet.  Found a wire dead ended - 1 less mystery wire.  We also found a really bad solution to getting the old water maker product water into the tanks.  That's getting fixed. We have some reconfiguring for the fill hoses but that was to be expected. We planned to use the drain plug taps to tie the tanks together and where ready to start that process, only to discover they were metric.  Yup we had Standard fittings.  Time to step back and take stock of what we had and what we needed.  Another order going out. ... After the yard guys quit, I removed the center of the salon floor supports so we could access some hidden fittings and also allow me to get to some valves on the fresh water tanks.  All but 1 tank had already been drained so I was able to remove the old valves.  They are all soaking in vinegar overnight.  The remaining tank can be drained tomorrow once the deisel we spilled into the bilge can be cleaned out - absorbent pads are out overnight.  The drain plugs in the deisel tanks were lower than what we could easily pump out, so we expected to get some pretty nasty stuff out. Good day overall, as I keep pointing out, I hate plumbing as getting all the parts necessary in the same place seems to be a god level skill that I don't process. The only tank in the boat that is not visible in this picture is ty he second black water tank. The mast slots onto the gray wavy tray between the closest water tanks.
'''9 Jan 2026:''' Today continued the running gear and fuel system work. We received the fittings and hoses we needed (or at least What we thought...) this morning so we did some more work on the deisel fuel plumbing.  We got the fikters/fluids changed on the GenSet and slid it back into place.  This allowed us to get to 2 floor panels we hadn't been able to get under yet.  Found a wire dead ended - 1 less mystery wire.  We also found a really bad solution to getting the old water maker product water into the tanks.  That's getting fixed. We have some reconfiguring for the fill hoses but that was to be expected. We planned to use the drain plug taps to tie the tanks together and where ready to start that process, only to discover they were metric.  Yup we had Standard fittings.  Time to step back and take stock of what we had and what we needed.  Another order going out. ... After the yard guys quit, I removed the center of the salon floor supports so we could access some hidden fittings and also allow me to get to some valves on the fresh water tanks.  All but 1 tank had already been drained so I was able to remove the old valves.  They are all soaking in vinegar overnight.  The remaining tank can be drained tomorrow once the deisel we spilled into the bilge can be cleaned out - absorbent pads are out overnight.  The drain plugs in the deisel tanks were lower than what we could easily pump out, so we expected to get some pretty nasty stuff out. Good day overall, as I keep pointing out, I hate plumbing as getting all the parts necessary in the same place seems to be a god level skill that I don't process. The only tank in the boat that is not visible in this picture is ty he second black water tank. The mast slots onto the gray wavy tray between the closest water tanks.
<gallery widths="220" heights="165">
File:Plumbing_2026-01-09_167593.jpg|9 Jan 2026
</gallery>


'''11 Jan 2026:''' So with the fuel system on hold pending fittings... did I mention i hated plumbing...  I have turned my attention to the fresh water system.  I have started making connections and you guessed it ... I need more fittings. So about 30% of the fresh water system is assembled and the water maker connections to it are getting closer.  We still need to drill and tap 2 inspection lids for 2 fresh water tanks for the water maker product water to enter the tanks but those tubes are run and I think we have the right fittings for that.  Also we have now cleaned as best as we can the fresh water tanks.  There was a layer of sediment on the bottom of all of them.  The larger tanks have a baffle which we can't clean behind.  We have the new shutoff valves for the fresh water tanks, but once again I bought the wrong fittings pex vs pex-a (there is a difference) so I orded replacement fittings to connect them.  They will be here on Mon. The filter water faucet I bought to allow us to test the product water before committing it to the tanks came with a spring loaded valve instead of one you  turn so it isn't suitable for our needs so it's going back as we need to let the product water run for a bit to let it stabilize once we start the water maker each time. Also I apparently didn't understand how faucets got plumbed into pex-a so I need to get different fittings for all of the faucets and the shower.  So so far we have made a trip to Home Depot ( that got a few things and a bunch that didn't work - they are going back) a trip to lowes - a few more things and more that needs to go back including stuff we bought weeks ago, only to discover that stuff was wrong and a couple of online orders (Amazon, etc). We bought a new shower fixture (Lowes) and it is not quite what we expected.  I think we can use it, but it's definitely not ideal. Did I mention I hate plumbing. We still need to get back to the fresh water pump and hot water heater (in the aft berth which is full of displaced stuff pending engine wrap up, as well as the shower on the back of the boat.  So yah more fun coming. Assuming I am doing it correctly, so far I do like working with pex-a.
'''11 Jan 2026:''' So with the fuel system on hold pending fittings... did I mention i hated plumbing...  I have turned my attention to the fresh water system.  I have started making connections and you guessed it ... I need more fittings. So about 30% of the fresh water system is assembled and the water maker connections to it are getting closer.  We still need to drill and tap 2 inspection lids for 2 fresh water tanks for the water maker product water to enter the tanks but those tubes are run and I think we have the right fittings for that.  Also we have now cleaned as best as we can the fresh water tanks.  There was a layer of sediment on the bottom of all of them.  The larger tanks have a baffle which we can't clean behind.  We have the new shutoff valves for the fresh water tanks, but once again I bought the wrong fittings pex vs pex-a (there is a difference) so I orded replacement fittings to connect them.  They will be here on Mon. The filter water faucet I bought to allow us to test the product water before committing it to the tanks came with a spring loaded valve instead of one you  turn so it isn't suitable for our needs so it's going back as we need to let the product water run for a bit to let it stabilize once we start the water maker each time. Also I apparently didn't understand how faucets got plumbed into pex-a so I need to get different fittings for all of the faucets and the shower.  So so far we have made a trip to Home Depot ( that got a few things and a bunch that didn't work - they are going back) a trip to lowes - a few more things and more that needs to go back including stuff we bought weeks ago, only to discover that stuff was wrong and a couple of online orders (Amazon, etc). We bought a new shower fixture (Lowes) and it is not quite what we expected.  I think we can use it, but it's definitely not ideal. Did I mention I hate plumbing. We still need to get back to the fresh water pump and hot water heater (in the aft berth which is full of displaced stuff pending engine wrap up, as well as the shower on the back of the boat.  So yah more fun coming. Assuming I am doing it correctly, so far I do like working with pex-a.
Line 229: Line 237:


'''14 Jan 2026:''' Day 3 of the fresh water system.  100' of both red and blue tube is now basically gone.  I had about 3' left of blue and 10' of red.  I used white for the tanks through the pump and tobthe hot water heater.  The last bits to install go from the pump to the hot water heater.  I haven't committed to the hit water heater quite yet as we haven't done the final engineering of tieing the coolant loop from the engine into it yet to provide free hot water.  As I predicted, I ran out of the compression sleeves, so I made a quick trip to Lowes after lunch. Deisel fuel system is still awaiting parts... Because we are replumbing a water tank to fuel, we needed to change the fill and air vents.  The pic below is the result of 3 hours of frustration removing the 35 year old fill hose from the tank.
'''14 Jan 2026:''' Day 3 of the fresh water system.  100' of both red and blue tube is now basically gone.  I had about 3' left of blue and 10' of red.  I used white for the tanks through the pump and tobthe hot water heater.  The last bits to install go from the pump to the hot water heater.  I haven't committed to the hit water heater quite yet as we haven't done the final engineering of tieing the coolant loop from the engine into it yet to provide free hot water.  As I predicted, I ran out of the compression sleeves, so I made a quick trip to Lowes after lunch. Deisel fuel system is still awaiting parts... Because we are replumbing a water tank to fuel, we needed to change the fill and air vents.  The pic below is the result of 3 hours of frustration removing the 35 year old fill hose from the tank.
<gallery widths="220" heights="165">
File:Plumbing_2026-01-14_052593.jpg|14 Jan 2026
</gallery>


'''15 Jan 2026:''' We got all but 4 of the deisel fuel hoses run yesterday.  I know that sounds like a lot, but with 2 sets of tanks (take-up and return), a fuel polisher, and 2 tank interconnects, the Racor filter, 2x3 way vlaves, a 4 way valve and a mainfold, there are actually ALOT of lines involved.  We are still missing some fittings and the 4 way valve we received was damaged.  But everything else is run and partially connected.
'''15 Jan 2026:''' We got all but 4 of the deisel fuel hoses run yesterday.  I know that sounds like a lot, but with 2 sets of tanks (take-up and return), a fuel polisher, and 2 tank interconnects, the Racor filter, 2x3 way vlaves, a 4 way valve and a mainfold, there are actually ALOT of lines involved.  We are still missing some fittings and the 4 way valve we received was damaged.  But everything else is run and partially connected.

Latest revision as of 18:43, 28 September 2026

Part of the Refit - 2025/ 2026 series. Draft — Lee to review. As-built to the September 2026 break.

If you want a fair test of your patience, re-plumb a 35-year-old boat. Almost every fitting we removed was brass, and almost all of it was quietly dissolving from galvanic corrosion where a bonding wire had broken years ago. We replaced essentially all of it, and along the way discovered the recurring truth of the refit: you are always exactly one fitting away from finishing.

Description

Before and after

Before After

The original watermaker

The new watermaker, 14 Nov 2025

The galley sink as found

The new galley sink, 27 Sep 2025

As found — earlier photos (9)

Whole-boat plumbing schematic — fresh, grey, black, sea water and bilge, with the legend for every fitting symbol.

Fresh water

Six original tanks, one of which we converted to diesel (see below), leaving about 130 gallons — roughly 70 on the port side (three tanks) and 60 on the starboard side (two) — which is about 40 gallons more than we carried on the Beneteau even after the conversion. The tanks follow the shape of the hull, so the senders don't read linearly; we calibrated each with a hose flow-meter, five gallons at a time, and a ten-point curve.

Everything downstream of the tanks is PEX-A — red for hot, blue for cold, white from the tanks through the pump to the water heater. We went through 100 feet of each colour, and we learned the hard way that PEX-A unions need a compression sleeve on every joint (skip it and it won't hold pressure). We took apart and redid a full day's work to add them.

New pressure pump and accumulator in the aft berth, a residential Rheem 6-gallon 110 VAC water heater with an engine-coolant loop for free hot water underway, a deck wash-down port, a rebuilt transom shower, and a drinking-water filter with its own faucet at the galley sink.

Grey water & bilges

Sinks drain overboard through their own thru-hulls, each with an inline shutoff. The master shower drains to a dedicated sump pump.

Bilge pumping is split by compartment:

Location Pump
Salon 500 GPH Rule submersible
Engine room 320 GPH Whale Gulper
Bow 320 GPH Whale Gulper
Crash pump (salon) 4000 GPH Rule submersible, 2" hose
Emergency large manual hand pump, 1½" hose

Each primary pump is monitored — cycle rate and run time — and feeds the master alarm panel (see Electrical). High-water float switches back up the salon, bow and engine-room compartments.

Black water

Two holding tanks, all-new sanitation hose (double-clamped, because everything below the waterline is), two electric macerator/discharge pumps replacing the old manual pumps, deck pump-outs, and anti-siphon protection on the toilet flush water.

The system gave us its worst surprise after launch — a serious odour problem, bad enough that we stopped inviting people aboard, traced to leaking tank fittings and both tank vent lines clogged solid. The fix and the flush-water anti-siphon-loop removal on the main head are both in the Aug 2026 build-log entries below.

Sea water

A shared raw-water manifold feeds the watermaker, both air-conditioners, the anchor wash-down and the aft wash-down, with the strainer relocated somewhere accessible and high enough that you can open it without flooding the boat. The two A/Cs originally shared one source and starved each other; the berth unit was moved to the main-head thru-hull.

Diesel & fuel polishing

Two tank groups (port and starboard) after converting one former water tank to fuel — a change that rippled through the entire system. The layout now includes a fuel transfer / polisher pump, two 3-way valves, a 4-way valve and a manifold, a Racor primary filter with a vacuum sensor (a $10 Amazon gauge doing the job Racor wanted $250 for), and the engine-mounted secondary filter. The fuel selector valves aren't intuitive to operate — see the 10 Jul 2026 build-log entry below for how they actually work, worked out the hard way during the splash-week fuel-priming saga.

Diesel fuel system: port and starboard tank sets through the Racor duplex filter and fuel pump to the main engine and generator.

Oil change

A permanent oil-change pump plumbed to both the main engine and the generator with an oil-pan valve on each, so an oil change doesn't involve lying in the bilge with a hand pump.

Oil-change system: one pump serves both the main engine and the generator.

Watermaker

A Sea Water Pro AC reverse-osmosis system under the forward port berth — RO membranes, a DC boost pump, an AC high-pressure pump, carbon / 20-micron / 5-micron pre-filtration, a freshwater flush feed, and a pickling feed so it can be laid up without taking it apart. Product water runs to the head sink through two valves: one selects a test tap versus the tanks, the other selects port or starboard fill. Eventually the watermaker will shut off automatically on tank level; it will not start automatically, because we want to taste the product water before it goes in the tanks. Commissioning waits for clearer water than the Gulf shakedown route offers — first real run will be somewhere the intake isn't full of silt.

Watermaker raw-water and product-water plumbing, from the same whole-boat diagram.

Diagrams attached above (from Plumbing 2.pptx): whole-boat schematic, diesel fuel system, oil-change system, watermaker plumbing — all design-stage drawings dated 17 Aug 2026, not yet reconciled against final as-built.

Plan

None written up yet. (Lee to add.)

Outcome

Status is current to the September 2026 break. The dated detail — what broke, what got rebuilt, what we tested — is in the build log below.

Still open (September 2026)

  • The main-engine exhaust water muffler (wrong size ordered; correct nozzles on the way — yard's item)
  • A leak that appears when the motor runs
  • Forward head flush water — same straight-across re-plumb as the main head
  • Salon A/C condensate hose doesn't reach the bilge (confirmed source of side water damage)

Lessons learned

None written up yet. (Lee to add.)

Build log — Lee's Facebook posts, verbatim

The paragraphs below are copied directly from Lee's own Facebook posts during the build (typos included) — not a paraphrase. Dates are the post date, not always the exact work date.

5 May 2025: No real pictures today. We were uninstalling stuff that is broke or being retired. Back of car is pretty full of stuff looking for a new home. We did fix the first issue - one of the cockpit drain hoses had shrunk in length and come off. The bilge has 3- 4 inches of sludge that needs to be pumped out after the pig pads have a chance to work. Lots of uninstall/ demolition before we can start putting her back together.

6 May 2025: We also "dewatered" the bilge. The boat has been dead electrically since we were here a month ago and the deckdrain hose that had shrunk and become disconnected allowed plenty of water to accumulate inside the boat. We drained over 8" of nasty stuff out. The area under the engine had oil and diesel going on also, so the pig pads were pretty full this morning. Unfortunately that nastiness migrated into the rest of the bilge so we got a fertilizer pump sprayer and a big bottle of simple green and made the 1st 2 passes of cleaning that up. The engine bay had 35 years of oily dirt & grime built up. 1 1/2 rolls of paper towel later we can see it was originally painted "white".

8 May 2025: Mechanic worked for several hours unistalling stuff in the engine bay. So far the thru holes appear to be servicable, although bonding will likely involve hose clamps as the original bonding tabs have long since disolved...

15 May 2025: We started sorting through the plumbing and I think we are eliminating 5 thru hulls up front. One of 2 forward heads was converted to storage but the 3 thru hulls associated with it were never removed. There are 2 more that held obsolete transducers. So any day we can eliminate holes below the water line I am happy. We also Uninstalled the last bilge pump and associated float switches and have a plan going forward for that function. Let's just say they were an issue waiting to jump up and let us know...

24 May 2025: Today was focused on tracing wire and then setting up the circuits for the 3 bilge pumps. We are going to split the bilge so that from the engine bay back is one area (to contain any spills) and then from there forward will be the primary area. So 2 primary bilge pumps with 100's of gal's per hour flow rates and then a 5000 GPH beast in the primary bilge area. The engine area "dam" is only 8" high so if something goes wrong there, it won't be too long before it spills over. The crash pump will be tied to the high water switch (alarm input) for the main bilge.

16 Jun 2025: After the yard workers clocked out (now on summer hrs 6- 2:30), we started cleaning up the abandoned plumbing in the forward berth area. A bit more to go but already pleased w the result.

18 Jun 2025: I pulled some more plumbing out and in the process, discovered that the forward starboard head is likely not even plumbed in right now. The toilet seat is broken and the hose that I think is supposed to be the raw water feed is not connected to the toilet. In pulling stuff apart, I discovered that there are 2 ways to empty the black water tank (deck vacuum - this is called a pump out) and the 2nd appears to be a manual pump. It's the same type of mechanism as the emergency bilge pump. This pump is mounted on the opposite side of the boat from the tank so there is lots of extra length in these hoses to make it work. The master head appears to be the same setup. Anyway, I am not impressed and with a little fore thought I will redesign this. Also the shower pan pump is also among the missing. There is plumbing that connects the 2 forward shower pans together (the port side was never disconnected) and there was a cut hose that likely went to a pump at some point, but no output... So in order to get functional forward shower, we need to do some plumbing work also. And no I haven't found the master shower pump either... This plumbing exercise was not in the original plans so this is an add-on. Today we decided it was time to clean the bilge. I have found some termite tracks and another area of damage (that included a couple of live bugs) that I don't know if they are new or hold over. Anyway these things need a fresh water supply so we want to dry out the bilge. As we've dealt with the water and termite damage, the bilge area has collected lots of mulch and debris that needed to come out eventually. We have running water in the paint shed, so we hauled a hose up into the boat and brought our drain hose back into the boat and spent most of the day scooping out mulch and dirt (and other stuff), spraying down and siphoning out the water that collected in the bilge. Long day, but the bilge area is now dry and not an inch deep in "sludge". I wouldn't call it clean, but what's left shouldn't foul the new bilge pumps. No before and after pics of this, but you can use your imagination...

11 Sep 2025: In more positive news, one of the yard guys with time on his hands started pulling apart the plumbing to reconfigure and replace 35 year old hoses today and I spent the afternoon assembling most of the main DC bus (at least temp connecting the major pieces). The big battery wire was delivered late today and the lugs we need to terminate it arrive tomorrow. We will then assemble all of that for real and the install and hook up the ac and DC panels. Then we can start bringing the boat back to life. Granted most everything powered is not ready for power but we can start hooking it up.

12 Sep 2025: Good day today. Yard guys and I uninstalled most of the remaining plumbing not associated with potable water. Several hundred pounds of 35 year old hoses r now in the dumpster. We still need to do the fresh water system, but those are 1/2 plastic pipes vs steel wire reinforced 2" pipes.

16 Sep 2025: So we started digging into it. The sink is above the Engine bay so it was encased in sound insulation wrapped around a plywood box that was screwed together. No huge deal, except the sink drains were apparently leaking as we immediately ran into rotten wood. The drain lock rings were sufficiently corroded that they fell apart when i went to turn them. The plumbing underneath was also "creative" - we discovered that upon removing all the old plumbing in the engine room.

27 Sep 2025: I opened up the water maker kit and surveyed it's contents. I think another thru hole below the waterline is going to go away as they provided an above the waterline fixture. Repurposed and enlarged the hole for the old manual black water tank pump for the control panel (see pic). It's just temp fitted for now. Also opened the sink box and that turned into enlarging the galley countertop sink hole to accomidate the new sink. An inch shallower than the old one but 1 basin vs 2.

29 Sep 2025: Brownie Hutchins started emptying out the tool/work closet formerly the forward Port Head with an eye towards completely converting that space to the function. Remember they didn't finish the decommissioning job and left the sink and a bunch of partially connected hoses. We had hesitated on whether to demo and start over as we thought we might repurpose the 2 thru hulls under the sink (intake for toilet and drain for sink) for use with the water maker and potentially something else. We unboxed the new water maker and discovered an ABOVE the waterline exhaust fitting so there was no need to retain the below the waterline thru hulls. That made up our mind and today we removed the shelves that had been added and then cut out the old sink/ vanity area. In the process of doing so, I forgot the sink drain was still connected to the thruhull and just yanked. The fitting that was screwed into the thru hull promptly broke apart. Hummmm. Fast forward all 3 sinks that are in our heads lead to compromised fittings. So 2 replacements and then fiberglassing over the 2 unneeded thru hulls. We knew there might be some issues as there was some extensive corrosion on them, but hadn't run them to ground yet. Pictures show the broken pieces. We are replacing these thru hulls with a newer composite technology that won't corrode or have galvanic corrosion issues. These brass pieces that failed likely bit it on galvanic corrosion which was an issue when we bought the boat.

30 Sep 2025: I then moved onto rebuilding the store/work room formerly known as the fwd port head. I first took it apart further to remove the remaining unneeded plumbing. It felt good to finally completely decommission this head. There are still fresh water lines that run through here, and we have not settled on their final configuration so we can't screw the new shelves down quite yet. But they are basically ready to install. Right now I have spacers to dry fit them in place. Not my best work, but they will ve more than functional.

3 Oct 2025: 2. Systems - plumbing mostly ready to be reassembled pending labor availability 3. Water maker - ready to be installed

7 Oct 2025: Yesterday we started removing old through hulls. Mechanic wants to do them all given their age.

14 Oct 2025: Today's update is all about plumbing. We met with the yard and decided the best answer is to remove all the thru hulls in the engine bay, and reglass. The inside surface of the hull is quite rough and needs painting badly. If we start from scratch, then we can place the right thru hulls where we need then and have a nice clean space to work in also. We also checked the old engine mount against the new motor. They are not a match anyway. Time to make new ones.... So 5 thru hulls came out, and then I removed the drain lines from the bottom side of the shower pan (see pic) and then we pulled 2 new hoses for the new primary bilge pump and the crash pump. The emergency hand pump hose is also going to get replaced. When I went to start rebuilding the shower drain lines, I discovered that the original T fitting (stainless steel) had also seen better days.

15 Oct 2025: Brownie Hutchins started cleaning the plastic "lenses" on the old engine/ GenSet strainers in hopes of reusing them - they are still servicable, brass and quite expensive to replace with like items. No pics yet on them.

18 Oct 2025: slower day today. Focused primarily on plumbing. We have decided we can further simplify the engine room and I was able to remove a couple of things from there (2 not replace anywhere). I also opened up the water maker parts boxes and started laying it out. Because I am going to set up the ability to pickle it without taking it apart, I need a few more fittings. So that stopped in its tracks. I then turned my attention to the other plumbing tasks and 8 orders on Amazon later, I might have most of the fittings we need to put the whole system together. I really don't like plumbing projects because I feel like I am always 1 fitting away from being able to actually get it done. The picture is of our makeshift table under the boat with all of the plumbing parts/ pieces we've removed so far. Most of that is brass and due to neglect over the years (galvanic corrosion because bonding wires broke or corroded) are being thrown away. The 2nd pic is an export of a powerpoint slide that shows all of the plumbing on the boat (fuel, black water, grey water, fresh water, sea water, engine cooling) The main engine and genset exhaust are not shown, but their exits are. The 3rd pic is the water maker layout. Today we focused on getting the AFT cabin's systems installed (or at least coming up with a plan to install). Our Bed actually sits on a pedestal and the space under the pedestal contains a modest set of drawers and the Air Conditioner for the cabin. As it sits astride the center of the boat, all of the ducts (exhaust and air in/out) run under the bed along with the steering cables. It also serves as the route any plumbing going to the back runs through - in this case, that includes our hot water heater and the fresh & aft sea water pumps. There is also space to mount other systems (part of our autopilot control - which I installed today) and part of the ultrasonic antifouling system. Along the air ducts, we are also installing fans to pull fresh air into the engine room and exhaust hot air out to make the engines (main engine & GenSet) operate better with a steady stream of fresh air and make the boat cooler by exhausting hot air.

19 Oct 2025: We receieved the fixtures to make the anti siphon loops for the flush water for the toilets. Those are now installed. We also received the hose we ordered fir the manual bilge pump. Apparently what I measured was 1 1/4 and it really needed to be 1 1/2 inches. We installed anyway and ordered an adapter to make it fit.

21 Oct 2025: 4. I think we have all but 1 delivery (scheduled for tomorrow) for the final parts to get the water maker installed. That will take a couple of hours as there are lots of pieces of plumbing and some electrical that need to be assembled (with hopefully no leaks).

29 Oct 2025: We also replaced the gaskets in 2 of the 3 sea strainers. Brownie Hutchins had already cleaned the lenses. The 3rd one is awaiting parts I ordered today as the yard only got the kits for 2 of them. We ran some more bilge pump hose. Apparently I needed more than we bought, so there is some more now on order. I will also start running sanitary hose for the black water shortly. Today's pic is one of the hoses for the 2 aft hatch (lazzarrette) deck drains. These have got to be the worst shape of anything we found on the boat. At one point they might have been black or maybe white and they are steel wire reinforced, although that wire is long since disintegrated everywhere except the drain and thru hull fittings which had to be cut still with wire cutters. One of the hose clamps was so bad, I had to torque it off using a set of vice grips.

3 Nov 2025: The first was removing the down stream hose and check valve associated with the emergency bilge pump. The check valve was basically not functional. the fitting consisted of several pieces of brass which of course loosened in the wrong order. A torch and hammer later, I finally liberated them from the hull and we can then look at how to hook up the new hose which we still have to put in place (as well as remove the old hose). The picture is the reassembled fitting. You can see from the blue dust, that it was slowly disintegrating due to galvanic corrosion and it was the source of the blue flakes in the water yesterday.

4 Nov 2025: While they were doing that, I took on the misbehaving bilge pump system. It seems I made a couple of wiring mistakes. I was able to verify the panel was working properly and then retrace the various wires and tracked down 6 mistakes in the system (38 different connections for 4 pumps, 4 float switches and 2 high water alarm switches and finally the panel lights 2 more). We spun up 3 of the 4 pumps (the last one isn't installed yet). The pump panel lights are working so it was a good day.

5 Nov 2025: Today's update. We replaced the hose on the outlet side of the emergency bilge pump. The old hoses where creative and failing. This is a big hand pump and if the hoses fail, it doesn't do us any good, so it go replaced 1 1/2 inch hose about 20' long. I started getting serious on assembling the water maker. Will hopefully get that all assembled tomorrow. Full day's science project ... i.e. the water maker. Not quite done but happy with the progress. Still need to mount, wire in and plumb in the High pressure pump, install the feed hose for pickling and sort out how to deal with the product water. The product water is going to run over to the head sink into 2 valves. The first valve will select between a tap in the sink (for testing) and the second valve will select either the port or starboard free water tank to fill. We also need to install a fresh water feed for flushing the system. Finally we need to decide where the thru hull is going for the brine waste water. The salt water source side also needs to be plumbed into the raw water line for the front of the boat which we haven't built yet. So more excitement up I. The port berth tomorrow.

6 Nov 2025: We ran the remaining hoses for raw water distribution inside the boat (except engine room) but as is my life with plumbing I am missing fittings. They have been ordered and we will continue those projects once they show up.

8 Nov 2025: Warm day today. That will change come Monday. We got 3 pumps mounted on new mounts today and got the AC High Pressure pump wired up for the water maker. There is an active discussion on how best to hook up the 3 pumps as they all have built in pressure switches and we might use external relays on these pumps. We'll share that decision and why later.

14 Nov 2025: We got the plumbing in the fwd port berth to the point where I need the yard to wrap up some of thier stuff next. This includes the water maker. I need to install the fresh water system next to wrap up the water maker. While we were in places where people aren't meant to be, I also got the new solinoid for the windlass installed. Once the chain locker and windlass support is done, we can start reassembling the ground tackle.

16 Nov 2025: A couple of days of work have the black water hoses run (not yet clamped) and the back salt water /toilet hoses are also now run.

26 Nov 2025: So we have red/ blue tubes now from the master head to the fwd Starboard head by way of the old port head. I also put a new vent on the tank vent line for the port fresh water tanks. These plumbing tasks needed to be completed before final assembly of the tool closet as they are located behind the outboard panels formining the back of the shelf cabinet. We'll get that done as a first task after Thanksgiving.

2 Dec 2025: We also pulled more of the fresh water tubing.

3 Dec 2025: We noticed the bilge was full of water - rain or work - not sure - but when we went to have the bilge pump pump it out the flow was weak to non existent. A bit of troubleshooting lead me to the inline check valve which had enough crud in it to prevent it from opening. Not real sure about that going forward. I pulled it apart and cleaned it, but fiberglass dust and dirt shouldn't have been enough to prevent the flap from opening. More to follow.

6 Jan 2026: We focused on the reconfigurayion of our deisel fuel system. 1st order of business was to pump out the tanks. 2 of the 3 were pretty full while the 3rd was about 1/3 full. We also removed all of the old tubing/ hoses etc as we are going to plumb it differently. Opening the inspection plates revealed black sludge (diesel algea) which didn't surprise anyone. So I used paper towels to clean it out as best as I could. I also cleaned a brown film out of 2 of the fresh water tanks. The yard didn't have the right fittings in stock to start the reassembly, so that will be tomorrow. We are converting 1 of the 6 fresh water tanks to deisel so it's all getting replumbed. There had been leaks of deseil and other petroleum into the bilge so I did another round of cleaning once all of the old fuel lines where out of the way.

8 Jan 2026: We also did a bit more prep to put the fuel system back together. If all the pieces show up tomorrow, we will ve focused on wrapping that up. For now I am contributing my labor/ time to the yard Mechanic/ Machinist so he's more effective vs working my own projects (other than after he quits for the day).

9 Jan 2026: Today continued the running gear and fuel system work. We received the fittings and hoses we needed (or at least What we thought...) this morning so we did some more work on the deisel fuel plumbing. We got the fikters/fluids changed on the GenSet and slid it back into place. This allowed us to get to 2 floor panels we hadn't been able to get under yet. Found a wire dead ended - 1 less mystery wire. We also found a really bad solution to getting the old water maker product water into the tanks. That's getting fixed. We have some reconfiguring for the fill hoses but that was to be expected. We planned to use the drain plug taps to tie the tanks together and where ready to start that process, only to discover they were metric. Yup we had Standard fittings. Time to step back and take stock of what we had and what we needed. Another order going out. ... After the yard guys quit, I removed the center of the salon floor supports so we could access some hidden fittings and also allow me to get to some valves on the fresh water tanks. All but 1 tank had already been drained so I was able to remove the old valves. They are all soaking in vinegar overnight. The remaining tank can be drained tomorrow once the deisel we spilled into the bilge can be cleaned out - absorbent pads are out overnight. The drain plugs in the deisel tanks were lower than what we could easily pump out, so we expected to get some pretty nasty stuff out. Good day overall, as I keep pointing out, I hate plumbing as getting all the parts necessary in the same place seems to be a god level skill that I don't process. The only tank in the boat that is not visible in this picture is ty he second black water tank. The mast slots onto the gray wavy tray between the closest water tanks.

11 Jan 2026: So with the fuel system on hold pending fittings... did I mention i hated plumbing... I have turned my attention to the fresh water system. I have started making connections and you guessed it ... I need more fittings. So about 30% of the fresh water system is assembled and the water maker connections to it are getting closer. We still need to drill and tap 2 inspection lids for 2 fresh water tanks for the water maker product water to enter the tanks but those tubes are run and I think we have the right fittings for that. Also we have now cleaned as best as we can the fresh water tanks. There was a layer of sediment on the bottom of all of them. The larger tanks have a baffle which we can't clean behind. We have the new shutoff valves for the fresh water tanks, but once again I bought the wrong fittings pex vs pex-a (there is a difference) so I orded replacement fittings to connect them. They will be here on Mon. The filter water faucet I bought to allow us to test the product water before committing it to the tanks came with a spring loaded valve instead of one you turn so it isn't suitable for our needs so it's going back as we need to let the product water run for a bit to let it stabilize once we start the water maker each time. Also I apparently didn't understand how faucets got plumbed into pex-a so I need to get different fittings for all of the faucets and the shower. So so far we have made a trip to Home Depot ( that got a few things and a bunch that didn't work - they are going back) a trip to lowes - a few more things and more that needs to go back including stuff we bought weeks ago, only to discover that stuff was wrong and a couple of online orders (Amazon, etc). We bought a new shower fixture (Lowes) and it is not quite what we expected. I think we can use it, but it's definitely not ideal. Did I mention I hate plumbing. We still need to get back to the fresh water pump and hot water heater (in the aft berth which is full of displaced stuff pending engine wrap up, as well as the shower on the back of the boat. So yah more fun coming. Assuming I am doing it correctly, so far I do like working with pex-a.

13 Jan 2026: Day 2 on reassembling the fresh water system. Well it's a boat and I didn't read (watch Univ of You Tube) before starting with the Pex-A and I missed a critical piece of each union (a compression sleeve). Well the instructions were pretty plain - skip the sleeve and risk not holding up to any kind of pressure. So after acquiring 75 sleeves (I think I still need another package as I went through 2 x25 ea packages and am into the 3rd) I set to work disassembling what I already assembled. I was able to use a heat gun to soften the tubing sufficiently to pull the fittings out without damaging them (most are just plastic). Anyway, we also purchased a better tube cutter, and some additional fittings when we bought the sleeves. The fittings appear to be what we need to hook up the faucet supply lines and the cutter is producing much better (square/ clean) cuts so everything is fitting together better. So I took apart everything we did on Sat and reassembled it (correctly). Additional fittings got delivered today and 3 of the 5 tanks are also plumbed in. I still got confused and bought "T"s vs 90's for the last 2 tanks, so that will have to wait til those fittings arrive. We'll see what kind of labor the yard assigns tomorrow to see if we are doing diesel or more fresh water. I started cleaning off the aft mattress platform to access the pumps underneath to continue the fresh water plumbing expecting that will be tomorrow's focus. The pump, hot water heater and maybe the Lazarette area (aft Shower).

14 Jan 2026: Day 3 of the fresh water system. 100' of both red and blue tube is now basically gone. I had about 3' left of blue and 10' of red. I used white for the tanks through the pump and tobthe hot water heater. The last bits to install go from the pump to the hot water heater. I haven't committed to the hit water heater quite yet as we haven't done the final engineering of tieing the coolant loop from the engine into it yet to provide free hot water. As I predicted, I ran out of the compression sleeves, so I made a quick trip to Lowes after lunch. Deisel fuel system is still awaiting parts... Because we are replumbing a water tank to fuel, we needed to change the fill and air vents. The pic below is the result of 3 hours of frustration removing the 35 year old fill hose from the tank.

15 Jan 2026: We got all but 4 of the deisel fuel hoses run yesterday. I know that sounds like a lot, but with 2 sets of tanks (take-up and return), a fuel polisher, and 2 tank interconnects, the Racor filter, 2x3 way vlaves, a 4 way valve and a mainfold, there are actually ALOT of lines involved. We are still missing some fittings and the 4 way valve we received was damaged. But everything else is run and partially connected.

21 Jan 2026: Today's update - the deisel system is basically done. We reconfigured the tanks (swapped one of the water tanks to deisel) so that had a major ripple through the entire fuel system. It was major battle to find all the right fittings/ hoses/ valves etc to put it back together. This should have been done before doing the bilge hoses as they were definitely in the way. But it was worth it as the system is now easier to monitor and we have a legitimate transfer pump/ fuel polisher now. No pictures as it's a bunch of fuel lines and valves that still need plastic engraved labels.

23 Jan 2026: We also started working on the hot water heater integration, but decided to pause while we confirm we can get replacement electric heating elements.

14 Feb 2026: I did start the process on plumbing in the anchor wash line, but the Bulkhead fitting i purchased (months ago) wasn't intended for a bulkhead this beefy. I have to eat that cost as we are way outside of Amazon's return windows due to the yard's failure to make progress there. We will 3'd print a fitting as finding something commercially available will be difficult.

17 Feb 2026: Also got the hot water heater plumbed in. Fresh water system is now plumbed. Several fixtures still need installation but am happy there.

18 Mar 2026: got back to working on plumbing today. The new shower fixture inside the boat. I've been putting this off as it's an adaptation of a household fixture and it's a bastardization at best. It's plumbed in and we are still sorting out the finishing touches. This does at least mark a milestone as we could pressurize the fresh water system now as it was the last open plex-A tubing. The sink fixtures are not connected ( no drains yet without thru hulls), but those all have shutoff valves inline.

14 Apr 2026: We also continued electronics wiring with today's focus being the extra features on the Inverter/ Charger. There are a handful of inputs and outputs on the inv/charger that we can use to control other items. In this case, there is an alarm out (now programmed and feeding that channel in the master alarm panel) and there is another "relay" also programmable that can be used to trigger an action based on power "levels". In our case turning the hot water heater on/off when the batteries are "full". This will allow us to turn on the water heater once the batteries are charged and we have excess solar power.

17 Apr 2026: I also spent the day on the boat's PC updating and configuring software so we can start programing the boat's electronics. Today's focus was the 2 devices that monitor the bilge and fresh water pumps and trigger alarms should they start cycling or run long. The programming was quite archaic and took several hours of troubleshooting to figure out what it was looking for, but at the end of the day that task is done. We just need to hookup the electronic switch to the appropriate Alarm panels inouts now.

24 Apr 2026: With this part of our 12VDC system online, we then moved onto the oil change pump - dead... and our fuel polisher pump ... dead. We had never been in a position to try either til now - they came with the boat. Replacements ordered...

28 May 2026: So a good day in the boat yard. The mechanic finally was able to work with me again. The focus was wrapping the fuel, raw water and oil change systems up. We failed miserably due to missing parts. We did advance each system, but nothing is wrapped up. For the raw water, we got it reconfigured so the strainer is now mounted in a more accessible place and high enough that it can be opened without flooding the boat. But in the reconfigurayion process we are about 2' of hose short, so that had to be ordered. I also need to redo the wiring hookups for the raw water flow sensors. I actually had the fittings we needed to wrap it up in my collection of parts. For the fuel system, we needed to add a vacuum sensor to the big RACOR prefilter. The plan was to back out the analog gage, add a Tee with the new sensor and put the gage back on the top of the tee. Apparently, the filter assembly hadn't been dissassembled in decades as every fitting required a mallet to break free. We also lost a couple of bolts onto the engine - gotta retrieve them today - anyway the gage was also basically frozen in place, so the wrench point which was only brass, rounded over and we finally destroyed it getting it off. RACOR want $250 for a replacement gage. Amazon $10 for a oil filled vacume gage...same scale, just without RACOR'S markings inside. Get to put it back together today after a good cleaning. We also mounted the last fuel part that came with the engine. Need yo plumb everything back together, but that is straightforward and we have the parts. The final step is the fuel tank senders. The oil change system was just missing fittings. Lowes had them so today we can install everything. We did get the engine oil pan valve finally mounted as we needed an extension that I ordered a month ago to install it.

29 May 2026: We got the RACOR cleaned and put back together and mounted. It had deisel algea in it so cleaning was needed. We started the process of installing thru-hulls by drilling holes in the hull. We started with the "keel cooler" holes (3). These are the heat exchangers for our freezers/ refrigerator. As a comparison to your house A-C - these do the same function as the outside part of the unit that sits outside your house (for home A-C the compressor sits at the center of the outside unit). We are using keel coolers verses air cooled because they are far more efficient and don't add to the heat load inside the boat. The sea water acts as an unlimited heat sink. Anyway, they have a threaded stem that extends through the hull and a backing plate and nut to secure them in place. The coolant lines run through this stem. We discovered our hull is cored when we drilled the holes. The core is made up of foam (good news because it won't rot). Bad news is that the fiberglass isn't as thick as we thought. Also the threaded stem was not long enough. Fortunately a longer version is available and the company is willing to exchange even though we've had them a year.... So we went on to drilling holes for other things. All of the holes forward except a sink are done and the "thru hull devices" are properly trimmed and ready for install. We then moved to the 3 at the back and this is where it went completely off the rails. We got water coming up through the hole as we drilled it. The foam core was completely saturated with water. Once the hole was drilled, water was literally draining out. The water was clear and had no oder. We think it's rain water. After pondering on it overnight, I think it might be coming from the Lazarrete where there is foam core exposed. This is likely water that's been accumulating during the time the lazarrette was not sealed. But that exposed foam needs to be sealed. We have everything now to wrap up fuel and oil change systems (and if the hose showed up, the raw water). Going to be a busy day.

2 Jun 2026: Other than the pump outs and the toilets, the black water system is now installed. Ran through a lot of the hose clamps i had saved along the way as everything below the waterline had to be double clamped. The Starboard side of the engine room is also basically complete with the fuel system being all tied together, the heavy capacity Balmar Alternator being tied in finally and cleaning up the wire routing. We also got the oil change pump and fuel polisher pump wired in and tested.

3 Jun 2026: So we made more progress today. Galley sink is now installed from faucet to thru hull. We could put water in the tanks and turn on the fresh water pump now (that's coming, but we want to connect the other fixtures.) We are going to add a drinking water filter/ separate faucet yet. We also got the deisel tanks' inspection lids redrilled and the tank senders installed including electrical connections. I need to "program" the receiver yet, but that's straightforward from the PC we have mounted on the boat. We also got tge 2nd freshwater sender electrically connected. So we are ready for both deisel and fresh water in our tanks.

4 Jun 2026: Today's focus was installing thru hulls. We got everything we had parts for in before lunch (8 of them)

7 Jun 2026: 1. Newly recertified life raft mounted. 2. FWD Black water Pump wired in and tested 3. Cockpit VHF Radio powered up (hailer still needs to be wired) 4. Drinking water filter for galley installed 5. Refrigerator wired in and cooling 6. While we had the manlift for the life raft install, we also got the network cable attached to the RADAR.

9 Jun 2026: We did more plumbing assembly yesterday. Ran out of fittings again...

13 Jun 2026: We also spent a couple of hours filling and calibrating our fresh water tank senders. The tanks "conform" to the shape of the hull so as they fill, they don't move the tank sender floats linearly. The system allows us to provide 10 intermediate points to calibrate it so it gives us the "right" amount in the tanks. The port side (actually 3 separate tanks) holds about 70 gals and the starboard side (2 tanks) holds about 60 gals. So 130 overall. This is almost 40 gals more than we had on the Beneteau (even after replumbing one of the tanks from water to deisel) we still need to do this process with the desiel tanks. We bought a water flow sensor for a hose and added water 5 gals at a time and recorded sensor reading compared to gals added. Not an exact science, but certainly close enough for our needs. Eventually, I hope to be able to have the water maker turn off automatically based on tank levels. I am not ready to have it come on on it's own as I like to test the product water prior to committing it to our tanks.

14 Jun 2026: Turned the fresh water pump on for the first time and verified we had done the plumbing "correctly". 2 missing washers on the shower line and a 1/4 turn on a fitting also on the same shower fixture and we had water were we expected it and no where else ( as far as we know). The transom shower is still not hooked up as apparently it's metric fittings. We just bought a whole replacement unit. We had to take the kitchen faucet apart to blow out an obstruction. It apparently caught the construction debries and clogged it up. But everything is working as intended. Even the alarm circuit works... the programming is likely missing a zero on the run time warning... easy to fix.

15 Jun 2026: For today's update, we plumbed in the last thru-hole. A combination of parts from Lowes and Ace and then combining the 2 sales people's ideas solved the challenge of 2" to 1 1/2" in a very difficult to access area. The emergency hand bilge pump outlet is now back together. It was also time to turn on the hot water heater. Had to remove the solid copper core wire it was wired with to replace it with more suitable marine wire, but we have hot water now. I also wrapped up the forward black water tank. Still need to bolt down the 2 toilets and attach their hoses... maybe tomorrow.

20 Jun 2026: Wrapped up the plumbing today (ok except for an exhaust hose - but that's the yard's problem). Resumed the berth A-C and continued moving stuff onto the boat.

24 Jun 2026: We also had a freshwater blowout. We had a leak in the fresh water rinse line for the water maker so I took it apart, revealed it and apparently over tightened it. Lowes trip in my near future.

29 Jun 2026: We got more stuff loaded onto the boat and I fixed the blow out on the fresh water line to the water maker. Otherwise we focused on putting stuff away. Even made our bed. If the a-c's work as expected maybe Tues night we'll move onto the boat for good.

1 Jul 2026: They have about an hour worth of touch up and then the plan is to go into the water. I went through and closed all the thru hulls so we only need to deal with 1 set of leaks at a time...

2 Jul 2026: Weĺl we didn't immediately sink. Granted the engine room bilge pump did come on. And the main bilge pump has been busy. 2. Several issues with the black water plumbing. Almost done. Still 1 leak. More later. 3. The valve between the water maker and the raw water feed is leaking through the handle when open. Not sure on that one yet. 5. The fittings on the anchor wash pump where leaking. Tightened them up.

10 Aug 2026: I will spare everyone pictures for today's activities involving our black water system. This is one of the systems we couldn't test out till we were in the water. The sanitation hoses used are the most ungainly difficult to route on the boat, other than the engine exhaust hoses. We have noticed very unpleasant odors in using the system. Bad enough that inviting people into the boat was something we were shying away from until I could get to the bottom of things. While working on something else, I had a floor panel up and we decided to test the flush and pump out on the back tank. Oh it's leaking.... That is likely the source of the issue (but both tanks stunk, so there is more to it. We took the fittings apart, cleaned them, applied new pipe dope and then after securing them, got out the heat gun to soften the hose to get a better seal there also. I did a quick look for the vent line and not immediately finding it, chose to move onto the other tank. OK Flush check - yup leaking. More heat gun work and that's solved. This vent line was easily visible so I took it apart. After dealing with a very old style compression fitting the tube was clogged and the 90 deg fitting was completely solid. That explains the liquid bubbling up around the inspection plate when flushing the toilet. Ended up replacing the fitting completely with a modern compression fitting. Well as the forward tank had a vent line, that mean the aft tank must also. It was under the 3 sanitization hoses that had to be removed in order to get to it. up the one I just resealed... Pulled it apart and decided that the tube was also blocked further down line, so we got some more tubing and a coupling in addition to the tank fitting. It's all back together but no without a visit to the lazzarette to check the end points as I couldn't verify airflow end to end. So I removed those fittings and confirmed we finally had airflow end to end. Put it all back together and initial testing yielded more favorable results. But that exercise took 5 hours. It's Miller Time and we will take on something else tomorrow. Oh and like many boat projects, it uncovered an issue we didn't even know we had - the condensate hose for the salon AC does not go all the way to the bilge and is now confirmed as the source for some of the water damage along that side. I will tackle that issue tomorrow.

12 Aug 2026: We battled (and I think won) the flush water for the main head's toilet. We had installed an antisyphon to ensure that we don't sink the boat depending on where the water line finally landed. The Beneteau's waterline was about an inch below the toilet bowl top leading to several comments about trying to sink our boat because valves got left open. Anyway the waterline verses toilet are no where near danger levels. The antisyphon was squeaking ever flush indicating it was letting too much air in and not allowing water to get pulled through. We removed the antisyphon confirmed no active water flow and re plumbed it straight across with no loop. The toilet flushes much better and we end up with a couple of inches of water in the bowl. I will likely do the forward head the same way (later) as but we can get decent water through it now. We also took on the berth ac plumbing. We wanted to be able to use both a-c's at the same time occasionally. Well they shared the same water source. And we noticed 1 would starve the other. I moved the line to the same thru hull that feeds the main head toilet and then after consulting with the A-C's distributor, we adjusted some parameters to combat it shutting down. The batteries drop in voltage much like lead acids as they drain and we've been hammering the batteries with mostly cloudy weather without supplemental charging. They apparently dropped low enough to trigger an under current situation.