Rigging, Sails & Ground Tackle

From Media for Unladen Swallow

Part of the Refit - 2025/ 2026 series. Draft — Lee to review. As-built to the September 2026 break; running rigging and sail tuning were still in progress.

The standing rigging and sails were both more than 15 years old when we bought the boat, so both were on the replace list from the start. Quantum Sails did the sails and the rigging package.

Description

Before and after

Before After

The mast on stands

Mast stepped and rigged, 17 Jul 2026

As found — earlier photos (7)

Standing rigging

The old rigging came off in 14 clean pieces and one stubborn one — the forestay, whose swaged fittings are permanent by design and don't want to come apart for reuse. The new rigging is properly-spec'd stainless.

The mast came down for the refit. While it was out we rebuilt the internal wiring run: a new conduit with 3D-printed holders every few feet, running the full 70 feet, fed through two new exit holes — one at the masthead, one below deck for easier termination. A styrofoam plug at deck height had to be speared out with a spearfishing spear taped to a boat hook.

Masthead: tri-colour / anchor light on a 3D-printed dissimilar-metal isolation spacer, wind instrument and indicator, a spreader that separates the two VHF whip antennas (AIS and salon VHF) so they don't interfere, two masthead blocks, cellular-modem antenna adapters, two radar reflectors, and an American-flag pulley on the port backstay about 20 feet up. Fold-down mast steps near the top make working up there possible from the Bosun's chair.

Mast base: lightning grounding cables, and a set of deck hold-down turnbuckles that pull down on the deck collar. That collar will carry 12-plus blocks for lines running up the mast to hoist, reef and trim; there is a lot of upward force on it, and the turnbuckles transfer that into the mast itself rather than relying on deck screws.

The mast was stepped 24 June 2026; the three forestays had to be cut to length afterward and their roller furlers assembled — two new roller furlers, foils and drums. Standing rigging was called "assembled" (not yet tuned) by mid-July: "she looks like a sailboat."

Running rigging

New throughout, and being converted toward single-line and jiffy reefing so the boat can be short- and single-handed. Colour-coded: black for the mainsail lines, blue for control and anchor lines, "Dwight" patterns for the spinnaker lines, white for the genoa halyard. Mostly 12–14 mm, with Tylaska and halyard shackles. Some lines came across from the Beneteau.

As of the September break the mainsail reefing lines were run and their hard-points bolted to the mast, but the sail hadn't been raised to check lengths — we were waiting on the proper mainsheet (the temporary line is far too short).

Double-line jiffy reefing: bitter end secured to the pad eye, line led through the cringle, back through the opposite pad eye, and down to a turning block at the mast base.

The spinnaker / whisker pole (telescoping) was rehabbed after arriving full of mud (see 8 Aug 2026 below).

Sails

New mainsail, genoa and staysail from Quantum; the asymmetric spinnaker was refit from storage, and there is a Code Zero for light air. Quantum put a Monty Python joke on the telltale sides: the genoa carries the "African Swallow," the mainsail the smaller "European Swallow." The first two sails were bent on 27 July 2026.

Cutter-rigged forward as designed, with a stack pack on the boom.

Ground tackle

A 77 lb Ultra primary on 300 ft of chain, a Mantus backup, a Fortress stern kedge, a rebuilt Maxwell 2200 windlass, and the chain-locker saga that came with all of it — full writeup on its own page: Ground Tackle.

Lifelines

New, in Dyneema, done by Brownie — the stretch-and-redo story is in the 1–2 Mar 2026 build-log entries below.

Diagram attached above: double-line jiffy reefing. Still to attach: running-rigging plan (from Running Rigging.xlsx) · masthead layout (no dedicated diagram found — photos only so far). Photos — mast wiring day, mast stepping, sails bent on.

Plan

None written up yet. (Lee to add.)

Outcome

Status is current to the September 2026 break. The dated detail — what broke, what got rebuilt, what we tested — is in the build log below.

Still open (September 2026)

  • Complete running rigging; raise the main to check and trim reef-line lengths (needs the proper mainsheet)
  • Tune the standing rigging
  • Replace the mast hailer / loudspeaker (water-damaged during the delay) and reprint the mast horn base (solid, not honeycomb)
  • Longer pins for the backstays (bolts standing in)
  • Final arch integration with the standing rigging

Lessons learned

None written up yet. (Lee to add.)

Build log — Lee's Facebook posts, verbatim

The paragraphs below are copied directly from Lee's own Facebook posts during the build (typos included) — not a paraphrase. Dates are the post date, not always the exact work date.

7 May 2025: We also met w the sail maker/ rigger this morning to advance that design effort.

10 Jun 2025: Another day of dissassembly. We focused on deck hardware so the sanding/ painting crew have better access to the deck. Several items are being moved/ replaced anyway. We are starting to collect jobs that don't need the boat so once they really go to town on the deck we can work elsewhere. So far we have the winches, headliner, rebuild DC electrical panel. Mount stuff in the new mounting panels, windlass service and assembly w new motor. I am sure there r other items but we should have a good week's worth of tasked queued up.

11 Jun 2025: We got a head start this afternoon. The team was busy prepping another boat for painting the it was just plain hot sitting there waiting, so we packed up and headed for the shop w all our stuff in it that happens to have an office area w AC. We set up the winch service shop there and made decent progress since we've never done this before. Note to self - remember if there r left over parts u r not done....

12 Jun 2025: We worked on cleaning the inards of the winches some more this morning. They are ready to be greased, oiled and reassembled tomorrow.

14 Jun 2025: Oh yah, we did a little boat related work this morning. Winches are reassembled (and they actually work...) and the bits that handle chain and line for the windlass are basically clean (or as rehabbed as 35 yr old bits can be) and ready to be reassembled. 6 hours in a vinegar bath did wonders for the brass friction cones. We pulled the plated pieces out after 3 hours as we didn't want the vinegar to do too much damage to the plating. We'll take a crack at replacing seals and adding the gear oil to the gearbox for Sun's part work day... Slow day today. Got the last winch off the Mast and serviced. No pics.

28 Jun 2025: In other news, with the yard still having a pretty long way to go to get the outside of the boat wrapped up, we have decided to take the middle of Jul - Aug off and come back on the 1st of Sept to sprint until we can splash. The hull is taking lots of time to dry out and even if it were ready in Aug, w Hurricane season in full swing, we r safer in the yard with the Mast unstepped than if we try to make a run for it.

8 Sep 2025: We also met with the rigger/ sail loft to plan out reattaching the deck hardware along with some new stuff. There's quite an assortment of tools and parts of pieces involved.

4 Oct 2025: The yard fiberglass guy has been busy in the bow starting to rebuild the anchor/ sail locker.

27 Oct 2025: So we got all of the inside the boat stuff related to our 2 electric winches temporarily assembled and squirrelled away above the ceiling. This involved pulling power and data cables through the ceiling.

10 Dec 2025: Good fay [day] today. 3/5 winches are reinstalled (got wrong fasteners for the 2 primaries) and the 2 jib car tracks are also installed.

12 Dec 2025: Pretty good day overall - the engine mounts are back in and epoxy is curing. We also got the top cap off the Mast and made progress on the bottom cap. We did some more deck hardware yesterday. Our favorite (NOT) yard employee took 3 attempts to make the standoffs for the new clutches (they needed to be lifted 1"). I can't make this up. A trivial task in Starboard. I did get the bottom end cap off the Mast. I think the machine screws must have been AL vs Stainless based on how easy they where to drill out. There is a piece of styrofoam at the deck height which we need to poke a hole in to install the new conduit track, but otherwise we think that project can proceed. There are 2 natural light prisms in the deck. They are both leaking (the last of the leaking pieces). The yard should have removed them months ago. Anyway, I got the off and it turns out the prism part is just acrylic and the top surface is badly crazed. The yard machinist was able to resurface them and then the painters polished that surface. While they were doing that, I cleaned up the frames and if all goes well we'll reinstall them today.

5 Jan 2026: So we are back in New Orleans. First order of business is the standing rigging. 14 of the 15 pieces are ready to go, but #15 is being difficult and I need to reach out to others that know more to advise how to get it apart.

30 Jan 2026: While prepping to install the electric winches, we discovered that a layer of material used to create the fiberglass "shelfs" for the winches never set up. Yesterday, that was patched so we can continue the winch install. We got the 2 winches bolted down before we quit so the holes don't leak in the rain today. We plan to wire them up in the next few days. We have done some more prep work on the mast to include a 3-d printed conduit holder design. We'll verify that today and if we are happy with it, print 70' worth of conduit holders. Likely some where between 15 and 20 actual holders.

31 Jan 2026: Well Birthday Day and I did work on the boat. Somewhat frustrating as help was a no show all the way around. I got the electric winches all wired up - need to configure once they are powered up and then the last few bits can be fastened on place.

1 Feb 2026: Left the other 2 off for now to make it easier to access everything still needing wiring. There are 2 additional panels planned but will likely wait til the standing rigging is set before they get added.

1 Mar 2026: Good day today. Lifelines are done as far as we can go for now (we are talking about how to properly support the last 2 solar panels in back and that will likely involve some more AL work which will end up as the lifelines anchor points for the back.

2 Mar 2026: Finally Brownie Hutchins started working on the lifelines. She got the 2 mid point gates done and then took on one of the long sections. We underestimated the amount of stretch in the dynema so that section needs to be redone and we plan to split it into 2 smaller sections so it fits better.

11 Mar 2026: Finally we temp installed our Scuba tank holders to see how they will work with the standing rigging which should be shipped this coming week.

4 Apr 2026: Started working on the mast today by laying out the conduit, the conduit holders and confirming the wire we need will fit inside. All is good. It will take us most of a day to feed it in and lock it in place I suspect.

7 Apr 2026: Mast day part 2 (part 1 was dissassembly) 5 hours to build/ install the new conduit, pull the wiring out of the correct holes (2 new ones). A couple of minor hiccups that where fixed by pulling a new messenger line and then withdrawing a cable and refeeding it using the new messenger line. And then we discovered the 2 antenna lines for the cellular modem (which the yard broke moving the mast last Thur) where pulled backwards. Wrong end at the top. We are just going to put new ends on them vs trying to redeem them as they are HEAVY THICK cables and we are afraid they may not go back in easily.

9 Apr 2026: We did get more mast work done yesterday with the fabrication work for the mast head now complete. We need to get electrical work done today. We are also adding a couple of fold down steps up there to make it easier for me to work on the very top when that becomes necessary. Without the steps, with just the Bosan's chair, the mast head is above my head while seated so it makes it difficult to reach and see anything.

15 Apr 2026: Somewhat productive day. First pictures are the mast outfitting. The top is almost done - the cellular antenna is awaiting a replacement antenna, but the mounting adapter is printing tonight.

17 Apr 2026: Christmas in Apr. Received 2 shipments in the last 2 days - the last piece from Atlantic Towers for the back solar arch and then today our most important delivery was our new $25k collapsible cooler that came with the free standing rigging and new roller furlers.

6 May 2026: The standing rigging is attached to the mast. Took 5 hours in the hot sun to separate, layout and assemble. The 3 pieces that lead forward (the forestays) were not cut to size, so they will need to be sized once the mast is stepped. That will complicate things as they need to be cut, assembled, and then we need to assemble the roller furlers. This will be a PITA given their size and weight.

20 May 2026: We also met with the rigger. We need a few more pieces, but the plan is the step the mast as soon as we have received them.

24 Jun 2026: Today's big goal was stepping the mast. We are going to try to get the boom on this afternoon also. We don't have all of the bits yet so the mast is being held in place with a temporary forestay and the backstays are not properly hooked up yet again due to missing parts.

24 Jun 2026: Got almost done with painting the hull and we got the boom attached.

25 Jun 2026: We also started terminating the wiring at the base of the mast. Almost done.

27 Jun 2026: We did some more outfitting on the deck - mounted our blue lights on the stanchions and went to mount the mast winches only to discover the mounting holes have caked dust in them. It was too late to fight with them yesterday, do that is a project for today.

1 Jul 2026: The last 2 solar panels, the deck box, and the running rigging still need to join the boat, but otherwise it's pretty well loaded.

5 Jul 2026: I did manage to get the last 2 winches cleaned and properly mounted on the mast. We are now ready to go up the mast and start outfitting it.

6 Jul 2026: Today we are starting the running rigging/ sails journey as I can't put my hands on the check valves locally based on my online searches this morning.

15 Jul 2026: Made measurable progress today. The standing rigging is 60% done. We got the back stays properly secured (need longer pins, but bolts will do for now). We got the front stay cut to length and its roller furler assembled and mounted. The shrouds (side guide cables) are now properly tensioned. That leaves 2 more head stays and a roller furler still to do. Likely Friday.

17 Jul 2026: Standing rigging is assembled. It still needs to be tuned, but she looks like a sailboat. Wind & canel current are not giving us confidence about moving us to our slip this afternoon so we are going to shoot for Monday.

19 Jul 2026: This afternoon we took on getting the mast electrical connections sorted out.

21 Jul 2026: We discovered that 2 of our solar panels are damaged - burnthru. Not sure the reason. We contacted BougeRV and they are working on the Warrenty claim. Today, the plan is to go to the top of the mast and to install stuff up there. Also the back stay is getting a block for the American flag about 20' up as there is no suitable place for it in the stern area. Will be an interesting chair ride...

28 Jul 2026: 4 hours in yhe hot sun but we have our initial 2 sails loaded (bent on) the boat. So far we are pretty happy with the results. We have lots of running rigging still to assemble. The Genny has the Afican Swallow and the mainsail has the smaller European Swallow on it. This was the first step ... lots of mast work to do to support the mainsail yet.

30 Jul 2026: I also continued chasing electrical cleanup with sorting switches that are not behaving as intended. I think we got 2 more sorted. We also replaced the bow red/green navigation light. So once i rebuild the mid mast light harness plug we'll have all of our USCG lighting working properly.

2 Aug 2026: We also got the spinnaker/whisker pole rehabbed and rigged. It was full of mud. We had to take it apart, wash and scrub it out. It is a telescoping pole and it is working much better now.

9 Aug 2026: We also received some more decals - see pics below. We have decals for the boom (the website URL) and a replacement decal for tge Starboard side name as it didn't go on smooth originally. That one will wait til we can do it with worrying about being gator bait. The boom is waiting for a cloudy day.

14 Aug 2026: We also got some more of the running rigging installed this afternoon.

16 Aug 2026: Yesterday evening, we also started mounting more stuff on the mast just out of reach from the deck. So another couple of hours in the bowsan's chair [bosun's chair].

18 Aug 2026: We also spent some more time outside tonight working on the rigging. I think we have all of the mainsail reefing lines run with their hardpoints taped and bolted to the mast. We still need to raise the sail to make sure everything is the right length and run cleanly. We are waiting on a new mainsail sheet line to really do that as the temp line we have is woefully short for the purpose.


Additional photos from the same posts (no dated log entry to attach them to):