Part of the Refit - 2025/ 2026 series. Draft — Lee to review. As-built to the September 2026 break.

A lot of the small custom hardware on the boat was printed rather than bought: adapters, spacers, mounts, washers and a few panels. This page collects it in one place — what was printed, what failed, and time-lapse clips of the printer at work.

Description

The printers

  • The refit log first mentions printing on 24 Jan 2026: “We are planning on doing lots of 3D printing while the weather outside is not conducive to being outside. We have a pretty long list of things to make installs work easier.”
  • On 26 Mar 2026 a larger 3-D printer and a laser engraver were installed aboard (photos in the build log below): the printer for bigger pieces, the engraver for custom switch faces.
  • The time-lapse clips below come from Colin's printer, an enclosed Elegoo Centauri Carbon with a chamber camera (the slicer profile in their file names reads ECC 0.4: 0.4 mm nozzle, 0.16 mm layers, Elegoo filament). It is not the larger printer installed aboard on 26 Mar.
  • On 19 May 2026 Lee wrote that “both machines were throwing fits and wasting parts and filament”; printing paused until both were working again.

Materials

  • ASA for anything outdoors — Lee, 30 Jan 2026: “We are using UV stable plastic (ASA)…”. Every ASA clip below is Elegoo ASA.
  • TPU 95A (Elegoo) for the flexible parts — the gasket and the “Body1” runs.

What we printed

Part First in the log Where it went Notes (from the log)
Arch through-bolt washers and pieces 30 Jan 2026 Solar, Dinghy & Davits ASA. Replace aluminium pieces that went back for a refund; the supplier wanted $40 each for the aluminium washers.
GPS and other mounts 30 Jan 2026 Solar Printed to secure equipment to the solar array.
Mast conduit holders 30 Jan 2026 (in place 7 Apr) Rigging, Sails & Ground Tackle A new conduit 70 ft up the mast; 15–20 holders planned.
Starlink adapter 6 Feb 2026 Solar Time-lapse clips: Starlink mount, Starlink spacer.
Companionway track adapters and slider 24 Jan 2026 Interior & Fabrication Took several rounds: 16 Mar “still didn't work as expected”, 30 Mar “now that the adapters fit”.
Chain-locker hatch cover 14 Mar 2026 Ground Tackle First panel cut half an inch off; a jig saw fixed it.
Masthead isolation spacer 10 Apr 2026 Rigging, Sails & Ground Tackle Printed overnight to keep dissimilar metals apart.
Helm-station switch and gauge panel 30 Apr 2026 (test print) Electrical Still waiting on the rest of the printed parts on 8 Aug.
Sound-bar mount 9 May 2026 Interior & Fabrication The first mounting did not work, so another print job.
Back-lit bilge pump panel 31 May 2026 Boat Automation and Monitoring Covers the old hole in the bulkhead.
Horn mount base 25 Jul 2026 Rigging, Sails & Ground Tackle Crumbled and came down; see the log.
Anchor-wash pump bulkhead fitting 8 Aug 2026 bow / anchor locker Failed under pressure; see the log.

Still open, as of the September break (all from Lee's own log entries)

  • Helm station: waiting on the rest of the printed parts (8 Aug).
  • Horn mount base: to be reprinted solid rather than honeycomb; “the pattern file still exists” (25 Jul).
  • Anchor-wash pump fitting: to be reprinted with the layers running the other way to the threads, or replaced with an alternative fitting (8 Aug).

Time-lapses

Twenty-four clips from Colin's printer, uploaded by him on 7 Feb 2026. The time in each file name (and in the links below) is the slicer's estimated print time, not the length of the clip — the clips are 1–15 seconds. Each link plays the video in your browser. The names carry the part and the material; where a note says more, it comes from looking at the clip.

Still Part Clips Notes
Washers
ASA
▶ 1h42m (4 s clip)
▶ 4h22m (4 s clip)
▶ 7h6m (7 s clip)
Curved, saddle-shaped washers, printed in batches. The 1h42m run ends in a tangle of stringy plastic (a failed print); the 4h22m and 7h6m runs finished. Probably the "washers that conform to the AL pipe profile" in the 30 Jan 2026 log entry below.
Antenna washer
ASA
▶ 12m57s (1 s clip) A short run; two small rings on the bed.
Starlink mount
ASA
▶ 10m47s (2 s clip)
▶ 5h47m (15 s clip)
A tall round sleeve. See the 6 Feb 2026 entry ("the adapter for starlink") and Solar.
Starlink spacer
ASA
▶ 36m51s (7 s clip)
▶ 41m11s (7 s clip)
A round sleeve with two cross-holes.
Spinlock dual mount spacer
ASA
▶ 20h22m (10 s clip)
▶ 20h22m (10 s clip)
▶ 20h22m (10 s clip)
A large flat plate with branching cut-outs, about 20 hours per print; three clips of the same job.
Body1
ASA and TPU 95A
▶ ASA 12m19s (1 s clip)
▶ ASA 23m36s (1 s clip)
▶ ASA 23m36s (1 s clip)
▶ ASA 27m26s (2 s clip)
▶ ASA 30m6s (1 s clip)
▶ ASA 9h13m (10 s clip)
▶ TPU 1h13m (2 s clip)
▶ TPU 1h15m (2 s clip)
▶ TPU 3h24m (2 s clip)
▶ TPU 5h43m (1 s clip)
The file names do not say what Body1 is. The ASA runs include a 9h13m batch of three plates with round bosses; the TPU runs are flat, ring-shaped pieces (TPU is the flexible one).
Body2
ASA
▶ 55m15s (7 s clip)
▶ 57m13s (7 s clip)
Looks like the same round sleeve as the Starlink spacer; the file names do not say what Body2 is.
Surface-mount box gasket
TPU 95A
▶ 28m2s (1 s clip) A very short clip; flexible material for a gasket.

All 24 clips — file pages

Lessons learned

(Lee to add.) Candidates already in his log: 19 May, 25 Jul and 8 Aug.

Build log

Lee's own words, from the Facebook posts, with the 3-D-printing paragraphs gathered in one place. Where a system page carries the same post, that page has the rest of the day.

24 Jan 2026: Today we removed the old companionway track and are designing a 3-d printed adapter to use a new track system. The original track system never sliee well and we have high hopes that this system will work much better.

We are planning on doing lots of 3D printing while the weather outside is not conducive to being outside. We have a pretty long list of things to make installs work easier.

30 Jan 2026: I got the dinghy lift installed yesterday. I was waiting on yard help (a lift) and some 3-d printing. We'll the 3-d printing finished but no yard so I used some Yankee enginuity and successfully did it myself. See pic. I still need the lift to drill some holes, but that will likely happen when we mount the solar array. See pic

We have done some more prep work on the mast to include a 3-d printed conduit holder design. We'll verify that today and if we are happy with it, print 70' worth of conduit holders. Likely some where between 15 and 20 actual holders.

I also drilled most of the holes to thrubolt the all archwork to their legs. I was waiting on 3-d printing pieces for that and they are now done. I managed to break a drill bit in the process. See pics. The 3-d pieces will replace AL pieces which are going back for a substantial refund.

We also printed a bunch of GPS and other mounts to secure that stuff to the solar array. The boat should look very different in a week or so.

6 Feb 2026: So we made some progress today. It was cold out there today. We decided that we needed to mount all of the electronics and lights before lifting this into place as the stuff further Outboard will be very difficult to reach.

This turned out to be a good idea as we had to rearrange the order so things will fit. We have a few more lights yet to go and the adapter for starlink which should all be 3-d printed by tomorrow as well as some wiring.

14 Mar 2026: … We are 3-d printing a replacement.

16 Mar 2026: We started by checking out the 3-d printed panel for the very back of the chain locker. Got the cutout dims wrong - just a 1/2 inch off. Jig saw solved that one.

We also had 3-D printed pieces for the compaionway reconfiguration, but they still didn't work as expected and the bolts on hand were not long either.

26 Mar 2026: We have also installed a new larger 3-d printer and laser engraver on the boat to help with custom fabrication.

29 Mar 2026: More carpentry and some more electronics hookups yesterday. More 3-D printing also which led to the need for more fasteners....

30 Mar 2026: Also the joys of 3-D printing. Turning a 3-D vision into reality is more challenging than you'd expect. We have a plan for the companionway slider. We now need to see how to "waterproof" it now that the adapters fit.

7 Apr 2026:

10 Apr 2026: We did get more mast work done yesterday with the fabrication work for the mast head now complete. We need to get electrical work done today. We are also adding a couple of fold down steps up there to make it easier for me to work on the very top when that becomes necessary. Without the steps, with just the Bosan's chair, the mast head is above my head while seated so it makes it difficult to reach and see anything.

The pic shows the spreader so the 2 VHF antennas will be far enough apart to not interfere with each other's signals (AIS, Salon VHF), the bracket for wind instrument and the mounting bolts for the masthead light - we printed an isolation spacer over night so we don't get dissimilar metals issues - so it will be installed today)

14 Apr 2026: In the mean time we got more 3-D printing done and should be installing more stuff on the mast today.

30 Apr 2026: Good day today. We continued rebuilding headliner while we started collecting detailed battery data while the test print for the 1st part of the helm station switch/ gauge panel printed. We also worked for a bit to try to bring the new Yarmar main engine computer online - requires more research...

9 May 2026: Got the new Salin TV mounted but of course the sound bar mounting is not working, so that's another 3-D print job.

19 May 2026: We had a hiatus with 3-d printing as both machines were throwing fits and wasting parts and filament. With serious persistence, both are now working, so we have a chance of getting the remaining items printed.

31 May 2026:

25 Jul 2026: So I made my second trip up the mast, this time with the intent of installing stuff. I did get our 4 courtesy flag lines installed and the last block to support them. Good news. I had also intended to finish installing the fasteners fir the horn mount. Instead, I removed the horn entirely before it fell down. The 3-d printed base was crumbling. It needed to be printed solid as opposed to honeycomb. The pattern file still exists, so it can be just printed. I also unistalled the hailer loud speaker to confirm its status. Yup FUBAR. It was a casualty to being left out and filling with water while the mast project got delayed and delayed. Will have to order a replacement .. another $80...

8 Aug 2026: We also had a 3D printed piece fail. This had a silver lining. We proved the bow bilge pump worked, the bow high water alarm worked. Also the water proof bulkhead is infact waterproof. The issue was the piece was our bulkhead fitting for the anchor wash pump. While working on the nav panel, I bumped the pump switch and it failed under pressure pumping sea water into the anchir locker. As I was working in the nav station area. The bow high water alarm went off. That led to finding a missing hose clamp and loose hose clamp feeding the bilge pump.

The piece failed because it was printed in layers parrellel to the threads creating a weak area. We are going to try printing the piece so the printing is perpendicular to the threads. Otherwise I will come up with an alternative bulkhead fitting.